Corrugated steel sheets for corrugated steel arch bridges and culverts and bridge and culvert installation method utilizing same
A technology of corrugated steel plates and arch bridges, which is applied in the field of corrugated steel plates used in corrugated steel plate arch bridges and culverts and the installation of bridges and culverts. The force performance is reasonable and the effect of meeting the assembly accuracy requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0061] A corrugated steel sheet for corrugated steel arch bridge culverts, such as figure 1 As shown, the corrugated steel plate used for the corrugated steel plate arch bridge culvert includes a corrugated steel plate main body 1, two end steel connecting plates 2-1, 2-2.
[0062] The two end steel connecting plates 2-1, 2-2 are rectangular steel plates with the same shape and size, the width of the rectangle is greater than the wave height of the corrugated steel sheet main body 1, and two end steel connecting plates 2-1, 2-2 are provided with two There are a total of n through holes in a row.
[0063] In the middle of the two wide sides of the corrugated steel sheet main body 1, a piece of end steel connecting plate is vertically welded respectively, and the width of the corrugated steel sheet main body 1 is l 2 The length l of the end steel connecting plate 3 Half a wavelength l at each end of 4 .
[0064] A method for installing bridges and culverts using corrugated s...
Embodiment approach 2
[0102] In engineering cases, l 0 = 15m, L = 6m, l 1 = 2m, l 2 = 1.7m, l 3 = 1.5m, l 4 = 0.1 m.
[0103] Step 1 calculates the number of rows N of corrugated steel plates used for corrugated steel plate arch bridges and culverts for building corrugated steel plate arch bridges and culverts:
[0104] N=15 / 2=7.5m
[0105] Calculate the number M of corrugated steel sheets for each row of corrugated steel arch culverts:
[0106] M=6 / 1.5=4m
[0107] Step 2. The long side cutting method of the two first rows of corrugated steel sheets used for corrugated steel arch bridge culverts directly connected with the first and second abutments D-1 and D-2 is:
[0108] The fractional part n of N due to the calculation 0 <0.6, the corrugated steel sheet used for the corrugated steel arch bridge culvert is cut into 1.5m along the direction perpendicular to the long side;
[0109] The cutting method of the wide side of the corrugated steel sheet used for the corrugated steel arch bridge ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com