Underground integrated pipeline non-standard rectangular connector determination method based on BIM (Building Information Modeling)
A technology of comprehensive pipeline and determination method, which is applied in special data processing applications, instruments, electrical digital data processing, etc., and can solve problems such as low work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0092] Taking a station of Xi'an Metro Line 2 as an example, the method for determining the non-standard rectangular connector line based on BIM is as follows:
[0093] Step ①: Create all underground comprehensive pipeline models in the BIM platform according to the CAD drawings of the subway station comprehensive pipeline design;
[0094] Step ②: Select two rectangular pipelines that need to be connected in the BIM platform, and the direction is not 90°, 180° or 270°;
[0095] Step ③: Obtain the specification information and space information of the two pipelines respectively;
[0096] Step ④: Calculate the spatial coordinates of the four vertices of the ports to be connected by the connectors of the two pipelines respectively, and determine the four planes of the connectors;
[0097] Step ⑤: Create the four planes determined in step ④ through the plane creation function or model matching method, so as to achieve the design purpose of the non-standard rectangular connector.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com