Digital-analog construction method of gas medium metering data early warning system
An early warning system and gas medium technology, applied in the direction of electrical program control, comprehensive factory control, comprehensive factory control, etc., can solve problems such as many measurement disputes, backward measurement data management, and data information feedback lag
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0062] Such as figure 1 As shown, the digital model construction method of the gas medium metering data early warning system, the method consists of the digital model construction method of the gas flow measurement system instantaneous volume data anomaly early warning system, the digital model construction method of the gas flow daily cumulative data abnormal early warning system and the total supply volume and The composition of the construction method of the digital model of the total usage data deviation abnormal alarm system.
[0063] in
[0064] The digital model construction method of the abnormal instantaneous volume data early warning system of the gas flow measurement system includes the following steps:
[0065] (1) The power energy data acquisition sub-station 2 samples the measurement data of the gas medium flow measurement system 1 in real time n=10 times per second, and the sampling values are x i (i=1,...,n);
[0066] ⑵ by the power energy data acquisition...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com