Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

58results about How to "Easy data maintenance" patented technology

Building knowledge mapping database and construction method thereof

The invention relates to a building knowledge mapping database and a construction method thereof. The construction method includes the steps that building data are obtained from one or more data sources and integrated; the building data include building classification class information, building geographic information, building basic information, building owner and user information and crowd searching and label classifying information; the crowd searching and label classifying information is obtained after label classified statistic and index calculation are carried out on the main searching content of crowds in a building; based on the integrated building data, the building knowledge mapping database is constructed; hierarchical classification and structural processing are carried out on the integrated building data; entities in a building knowledge mapping include a building entity, a unit entity, a searching label entity, a searching point location entity and a unit industry entity. The building knowledge mapping database can be beneficial for maintaining and fusing the building data better and effectively using the building data for application programs and data reasoning, and the building data embody matching of the building and audience crowds in the building.
Owner:上海分众信息技术有限公司

Electronic shelf label management information system

InactiveCN104463479AAdapt to the requirements of rapid developmentReduce workloadResourcesElectronic shelf labelInventory management
The invention discloses an electronic shelf label management information system which comprises a user management subsystem, a configuration management subsystem, a display management subsystem, a promotion management subsystem, a space management subsystem, a shelf management subsystem, an inventory management subsystem, an inquiry statistic subsystem, a price changing service subsystem and a data interface service subsystem. The user management subsystem is in charge of configuration of menus and permission of the whole system and is the base of operation of the whole system. The data interface service subsystem is in charge of the collection of basic data of the electronic shelf label management information system. The configuration management subsystem carries out maintenance and compilation on the basic data. The display management subsystem, the promotion management subsystem, the space management subsystem, the shelf management subsystem and the inventory management subsystem are in charge of the management of the service data of electronic shelf labels. The electronic shelf label management information system achieves space management and marked price and inventory management, the practicability, the safety and the reliability are improved, and the electronic shelf label management information system is extendable and easy to operate.
Owner:HANGZHOU ZHEDA SUNTOWN TECH

Method and system for processing reconciliation difference

InactiveCN108376363AImplement independent migrationAvoid extraneous migrationsFinanceTheoretical computer scienceData file
The invention relates to a method and system for processing a reconciliation difference. The method comprises: S1, an accounting book file of a commercial tenant is obtained and a local accounting book file is invoked from a local system; S2, reconciliation is carried out on the accounting book file of the commercial tenant and the local accounting book file and a reconciliation result file is generated, wherein all reconciliation results include reconciliation description parameters in the reconciliation result file and the reconciliation description parameters are used for describing whetherthe reconciliation result is a balancing result, if so, the reconciliation description parameters set to be balancing ones, and otherwise, the reconciliation description parameters are set to be difference accounts; S3, whether the reconciliation result file is null is determined; if so, early warning information is sent to the front end from the system and the operation of the method is ended; and if not, the step four is performed; S4, information of reconciliation results having the reconciliation description parameters to be difference accounts is extracted and a different account data file is generated; and S5, according to the different account data file, a difference account cause is determined.
Owner:PING AN TECH (SHENZHEN) CO LTD

Building information map construction method

The invention discloses a building information map construction method. The method comprises the steps of obtaining building data from one or more data sources, and integrating the building data, wherein the building data comprises type information used for building classification, building geographic information, building basic information, building belonging and user information, and crowd search and tag classification information, and the crowd search and tag classification information is information obtained after tag classification statistics and index calculation are performed for main search contents of crowds in buildings; performing standardization processing on the building geographic information; by calling a search interface provided by a map database, searching for the building geographic information subjected to the standardization processing, thereby determining specific positions of the buildings; and by calling a tagging interface provided by the map database, taggingthe integrated building data in the determined corresponding positions of a graphic layer of a map, thereby realizing building information map construction. The building related information can be intensively displayed on the electronic map in a visual, integrated and high-expandability manner.
Owner:上海分众信息技术有限公司

Three-dimensional pipe model establishment lofting method and device for geography information system

The invention provides a three-dimensional pipe model establishment lofting method and device for a geography information system. Three-dimensional pipe point symbols are stored in a symbol library of the geography information system. The three-dimensional pipe point symbols are equipped with scene self-adaption parameters. The method comprises the steps of obtaining three-dimensional geometric network topology data composed of vector point data and vector line data; finding three-dimensional pipe lines connected with three-dimensional pipe points according to a topology connection relationship between the three-dimensional pipe points and the three-dimensional pipe lines, wherein the topology connection relationship is identified by the three-dimensional geometric network topology data; and determining self-adaption parameters corresponding to the three-dimensional pipe point symbols in the symbol library according to three-dimensional pipe line sections and lofting the three-dimensional pipe points. According to the method and the device, through adoption of the means, customization and reuse of the self-adaption three-dimensional pipe point symbols can be realized, work such as manual modeling and matching of the three-dimensional pipe points with the three-dimensional pipe lines can be removed, data maintenance is facilitated, and the manpower and material resources are saved.
Owner:BEIJING SUPERMAP SOFTWARE CO LTD

Bioinformatics high-performance information management system and data processing method

The invention relates to a bioinformatics high-performance information management system and a data processing method. The bioinformatics high-performance information management system includes a server module; the server module is electrically connected to an information acquisition module and a cloud computing module through an Internet network; the server module is connected to a budgeting module; a sample allocation unit, a sample detection unit, a device management unit and a marking unit are arranged in the information acquisition module; the marking unit is connected to the sample allocation unit; the sample allocation unit is connected to the sample detection unit; operation software is arranged in the server module; the operation software includes an man-machine interactive interface; a data updating unit is arranged in the man-machine interactive interface; a user management unit is arranged on one side of the data updating unit; a synchronization zone unit is arranged on oneside of the user management unit; an induction classification unit is arranged on one side of the synchronization zone unit; and a preview unit is arranged under the induction classification unit. The bioinformatics high-performance information management system and the data processing method can achieve classification management and computing of bioinformatics big data, and can improve the working efficiency.
Owner:魏霖静

Step-length-varying multi-program synchronous calculation system and method based on time domain control technology

The invention discloses a multi-program synchronous calculation system and method based on a time domain control technology. The system comprises several application programs of different types, a main dispatcher, and a sharing module, wherein the application program of each type is used for calculating one type of parameters in the field of nuclear power. The main dispatcher is used for setting a dispatching time, and issuing dispatching instructions at intervals in the dispatching time, wherein the application program receives the dispatching instructions, several time step lengths are set to complete the calculation within the dispatching time and according to a convergence criterion, and the sum of all the time step lengths equals the dispatching time; the sharing module is used for storing and updating the calculation result of each time step length of the application program in the dispatching time. According to the step-length-varying multi-program synchronous calculation system and method based on the time domain control technology, cooperative calculation of multiple step-length-varying application programs can be conducted simultaneously. It is guaranteed that all the application programs provide precise calculation synchronously, the calculation precision is high, and the efficiency is high.
Owner:RES INST OF NUCLEAR POWER OPERATION +1

Product recommendation method and device for agricultural material e-commerce platform

The invention discloses a product recommendation method and device for an agricultural material e-commerce platform. An association relationship of users' regions, seasons, and agricultural materialsis established; and agricultural products planted correspondingly at specific seasons in users' regions and agricultural material products with specific purposes at corresponding planting stages are obtained and the information is recommended to users, so that the characteristics of the agricultural material e-commerce platform are met well. The method comprises: according to region information and access time of a user, at least one first associated label group having a corresponding season interval and regional interval are obtained; according to a purpose label, a class label, and a crop label in the first associated label group, at least one corresponding first information label group is obtained; a corresponding product information list is screened out from a product base based on thefirst information label group; and according to a preset product sorting mechanism, the product information list is ranked to obtain a product recommendation order and the order is fed back to the user. In addition, the device is composed of a first acquiring module, a second acquiring module, a screening module, and a sorting module that are used for implementing the above-mentioned method.
Owner:浙江中农在线智慧农业有限公司

Remote monitoring system and monitoring method for underground communication cable

The invention relates to a remote monitoring system and a monitoring method for the underground communication cable. The system comprises an inflator and a data collector; the air pressure sensor, the inflator and the data collector are arranged according to the direction by a underground communication cable and are connected with the underground cable on one hand, and are connected with the telephone network on the other hand; meanwhile, a monitoring computer is connected with the telephone network through a modem. When in use, the monitoring computer sends monitoring instructions regularly; the cable inflator and the data collector respectively send back the running state of the inflator, the warning message and air pressure signals from each monitoring point for the underground communication cable in time; the data collected is saved in the monitoring computer; when a warning message turns out on the inflator, the message is sent to the monitoring computer, and the monitoring computer saves the message and analyses and processes the data, and then a warning is given out on the computer through sound, light and other signal mode to promote the operator to process. The invention has the advantages that the reliability, real-time performance, safety and other performance of monitoring underground cable are greatly improved.
Owner:DACHENG TELECOMM TECH

Building knowledge graph database and its construction method

The invention relates to a building knowledge mapping database and a construction method thereof. The construction method includes the steps that building data are obtained from one or more data sources and integrated; the building data include building classification class information, building geographic information, building basic information, building owner and user information and crowd searching and label classifying information; the crowd searching and label classifying information is obtained after label classified statistic and index calculation are carried out on the main searching content of crowds in a building; based on the integrated building data, the building knowledge mapping database is constructed; hierarchical classification and structural processing are carried out on the integrated building data; entities in a building knowledge mapping include a building entity, a unit entity, a searching label entity, a searching point location entity and a unit industry entity. The building knowledge mapping database can be beneficial for maintaining and fusing the building data better and effectively using the building data for application programs and data reasoning, and the building data embody matching of the building and audience crowds in the building.
Owner:上海分众信息技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products