A new method of rapid water stop and soil improvement
A water-stop and fast technology, applied in soil protection, construction, infrastructure engineering, etc., can solve the problems of slow slurry coagulation, poor piling effect, slow construction, etc., to achieve high slurry utilization, material saving, enhanced The effect of compactness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0022] A new type of rapid water stop and soil improvement method, the steps are as follows:
[0023] 1), stop water;
[0024] The steps to stop water are:
[0025] a. Determine the water stop location, which is 1~2m back above the water outlet, and determine it as the drilling location.
[0026] b. Use a drill to drill holes.
[0027] c. Configure water glass and phosphoric acid slurry, water glass and cement slurry. In the water glass and phosphoric acid slurry, phosphoric acid is 50-70% phosphoric acid, and the volume ratio of phosphoric acid and water glass is 1:5-2:5. In the water glass and cement slurry, the volume ratio of water glass and cement slurry is 1:1-1:4.
[0028] d. Inject water glass and phosphoric acid slurry with a volume ratio of 1:5-2:5 to stop water.
[0029] e. Inject water glass and cement slurry with a volume ratio of 1:1-1:4 for reinforcement.
[0030] 2) Soil reinforcement and improvement;
[0031] The steps of soil reinforcement and improvement are:
[0032] a....
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com