High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process
A high-pier cable-stayed bridge and construction method technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of difficulty in construction of No. Wide range of effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] Embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.
[0028] like figure 1 and figure 2 As shown, a construction method of the No. 0 block of a high pier without a support in the present invention divides the super-long No. 0 block into a plurality of sub-sections for pouring, and pours one sub-section each time, specifically including the following construction steps:
[0029] S1. Divide No. 0 block into a plurality of sub-sections 3 to be poured, lay two pad beams 9 on the main tower beam 1 that has been poured, and erect a load-bearing beam 4 on the pad beams 9, the two pad beams 9. Lay in parallel along the cross bridge direction to support the load-bearing beam 4; install a rear anchor system 5 above the pad beam 9 near the center of the main tower beam 1, for anchoring one end of the load-bearing beam 4 to the main tower beam 1; The other end of the load-bearing beam 4 is extended to the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com