Vertical row-connected hydraulic reclamation dam structure for water areas
A vertical, row-by-row technology, applied in the direction of water filling and land construction, can solve the problems of resource conservation, energy saving and emission reduction, etc., and achieve the effect of low technical difficulty and broad application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0033] Example: Taking the heightening and finishing project of Beiyang coating surface in Taizhou City, Zhejiang Province as an example, a large area of the site is located in the water area, and the construction of the soil enclosure, sand enclosure, and pond soil enclosure structures in the water area is difficult to ensure the formation of enclosure sections, which cannot meet the requirements. Engineering requirements; riprap enclosures require the use of a large amount of stone materials, a considerable investment in construction funds, and a long construction period, and the structure of riprap enclosures cannot be used in breeding areas; sand-filled enclosures have been used in dredging and land reclamation projects in recent years There are many applications and mature technology, but there is no filling sand material that meets the engineering requirements in this area, and the source of sand material transported abroad is unstable, which will greatly increase the co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com