Construction method for forming grooves and holes and replacing large-diameter piles with small-diameter piles
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- GUANGDONG FOUND ENG GRP CO LTD
- Publication Date
- 2015-01-07
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention is used in the field of foundation construction, and in particular relates to a construction method in which grooves are formed, holes are formed, and large-diameter piles are replaced by multiple small-diameter piles. Background technique
[0002] In the trenching construction of the underground diaphragm wall, the traditional method is to use a circular hammer to break the rock mass to form a hole, and then use a square hammer to repair the hole and form a trench; in the process of forming a large-diameter pile under hard rock geological conditions, conventional The best method is to use a pile driver with low efficiency to form a hole. These methods all have obvious disadvantages such as low efficiency, long construction period and high cost. Grooving and hole formation in rocks has always been a difficult point in underground engineering construction, especially when entering rocks after passing through weak strata, and when encounte...