PCB enterprise order management and production planning system

A technology for production planning and order management, applied in the direction of calculation, data processing applications, instruments, etc., can solve the problems that affect the production progress, the procurement plan of raw materials/components cannot match the production plan, and cannot meet the delivery date of customers, etc., to reduce the cost of enterprises The effect of production costs

Inactive Publication Date: 2015-01-21
叶校然
View PDF3 Cites 44 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] For material and capacity planning and on-site detailed operation scheduling, PCB companies often adopt an order-receiving policy and a production scheduling method of roughly estimating production capacity because they cannot accurately grasp the actual production capacity status and material purchase schedule at the manufacturing site. , but under the basic premise of improving the service level to customers and promising the delivery date, the production workshop often uses overtime or o

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • PCB enterprise order management and production planning system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The present invention will be described in further detail below in conjunction with the examples, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, so as to define the protection scope of the present invention more clearly.

[0017] Such as figure 1 As shown, a PCB enterprise order management and production planning system includes three parts: order selection and coordination, production planning and scheduling, plan adjustment and rearrangement, and is characterized in that:

[0018] Order selection and coordination: determine the production order according to the delivery date, order importance, order quotation, and production capacity;

[0019] Production planning and scheduling: generate production scheduling based on (1) meeting the scheduled delivery time requirements, (2) improving equipment utilization, and (3) priority of customers and orders; arrange equipment according to the production sc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a PCB enterprise order management and production planning system. According to the system, a production schedule in a period of time is automatically generated according to the production capacity of existing equipment, and the equipment, personnel and materials are arranged. The system is operated in coordination with a PCB enterprise product tracking query system and can master the processing progress of each order and the equipment utilization condition. If abnormal situations such as equipment failure and material shortage occur, or a customer inserts an order or withdraws an order, deviation between the actual production situation and the scheduled production plan occurs, the system can conduct calculation again and generates a new production plan and an order schedule according to the situations, and a new estimated product delivery time is provided.

Description

technical field [0001] The invention relates to an automatic scheduling system. It is especially suitable for a PCB enterprise order management and production planning system. Background technique [0002] For material and production capacity planning and on-site detailed operation scheduling, PCB companies often adopt an order-receiving policy and a production scheduling method of roughly estimating production capacity because they cannot accurately grasp the actual production capacity status and material purchase schedule at the manufacturing site. , but under the basic premise of improving the service level to customers and promising the delivery date, the production workshop often uses overtime or outsourcing to meet the order delivery date. In addition, because material planning cannot take into account the limitation of production capacity, the procurement plan of raw materials / components may not match the production plan, which affects the established production sch...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06
CPCG06Q10/06316G06Q10/06313
Inventor 叶校然
Owner 叶校然
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products