Power grid enterprise team work load quantitative method

A workload and quantification method technology, applied in instruments, data processing applications, information technology support systems, etc., can solve problems such as insufficient consideration and inability to quantify workloads in an all-round way, so as to improve rationality and improve work coordination capabilities The effect of human resource utilization efficiency and labor balance
CN104537469AInactive Publication Date: 2015-04-22JIANGMEN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
JIANGMEN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID
Publication Date
2015-04-22
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention provides a power grid enterprise team work load quantitative method. The method comprises the following steps of setting up a model hierarchical structure, obtaining model input indexes, calculating centesimal system data of the model input indexes, and obtaining work load scores of all plans according to the centesimal system data and a pre-built work load quantitative model. According to the power grid enterprise team work load quantitative method, through quantification of work loads of all the plans of a power grid enterprise, the work load scores of all the plans are obtained, certain difference of work loads between different work types, different teams, different workers and the like in power grid enterprise teams is found out, and therefore the amounts of work of teams and workers can be adjusted according to actual conditions, optimized task assigning is carried out according to the loads and skill levels of workers, work of all units is balanced, and the manpower resource utilization efficiency of teams of the power grid enterprise is improved.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a method for quantifying workload, in particular to a method for quantifying workload of a power grid enterprise team. Background technique

[0002] With the continuous development and progress of social economy and cultural life, cities rely more and more heavily on power. Without power supply, the transportation, production and life of the whole city will be paralyzed, and the power system is a man-machine- Environmental system, in order to ensure the stable operation of the power system, it is necessary to reasonably design and allocate the work of the team members of the power grid enterprise.

[0003] Workload evaluation is an important part of job design. A good job design should keep the workload in such a way that the worker has the lowest error rate, the best work performance, and keeps the average workload level within the worker's working capacity. In order to do this, it must be based on the results of workload qua...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine