Temporary grouting corridor and its construction method
A technology of grouting corridors and construction methods, which is applied in the direction of infrastructure engineering and construction, can solve problems such as time-consuming months, and achieve the effects of solving contradictions, shortening the straight-line construction period, and high reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The present invention will be further described below in conjunction with the drawings. It should be noted here that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation to the present invention.
[0020] Such as figure 1 As shown, the temporary grouting corridor involved in the present invention includes a foundation surface 1 and a replacement body 2. A replacement excavation space 4 is provided below the foundation surface 1 of the dam 3, and the replacement excavation space 4 faces the riverbed. The geological defect and its influence zone 5 extend, a grouting corridor 6 is reserved in the replacement excavation space 4, and the replacement body 2 is cast in the replacement excavation space 4, and the grouting corridor 6 outer. The replacement excavation space 4 must be located at the exposed part of the geological defect and its influence zone 5 in the river bed, below the foundation surface 1, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com