Method for shield tunneling construction in pebble bed
A pebble bed and shield technology, which is applied in earthwork drilling, mining equipment, tunnels, etc., to reduce construction risks, improve tunneling efficiency, and save construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The present invention will be described in detail below, but the present invention is not limited to the following examples.
[0020] Dalian Metro Phase 1 Section 104 project includes three stations and two sections, namely Gongcheng Street Station, Convention and Exhibition Center Station, Xinghai Square Station and the section from Gongcheng Street Station to Convention and Exhibition Center Station to Xinghai Square Station. The project starts from Toujing at the south end of Gongcheng Street Station and ends at Toujing at the north end of Xinghai Square Station. The total length of the section tunnel is about 2,500m. The design cross-section of the shield tunnel is circular, with an outer diameter of 6.0m and an inner diameter of 5.4m. Two Herrenknecht composite EPB shields are used for tunnel excavation. The upper part of the tunnel in the Gonghui section is mainly composed of pebbles, and the lower part is dominated by strongly weathered and moderately weathered...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com