Loquat orchard planting land preparation method
A loquat tree and orchard technology, applied in the field of loquat tree orchard planting and land preparation, can solve the problems of not being well adapted to the terrain, low loquat fruit yield, affecting the growth and fruit of loquat, and achieving high survival rate and increased yield Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] A loquat tree orchard planting site preparation method, comprising the following methods:
[0013] (1) Establish fruit row belts: fruit row belts are built with a width of 2.5m and a belt length of 20m, which is convenient for farming, and horizontal ladder belts need to be built for sloping orchards.
[0014] (2) Digging the planting ditch: the dug planting ditch is 1m long and 0.7m wide. When digging the trench, put the topsoil aside and use it for backfilling.
[0015] (3) Backfill soil: first put the topsoil into the bottom layer, put the bottom fertilizer in 3 layers, one layer of fertilizer and one layer of soil, mix the phosphate fertilizer with the soil and organic fertilizer, and apply the backfill height to 1 / 3 of the ditch, and finally use fertilizer The mound is high, and its height is 30cm higher than the ground surface.
Embodiment 2
[0017] A loquat tree orchard planting site preparation method, comprising the following methods:
[0018] (1) Establish the fruit row belt: the fruit row belt is built with a width of 3m and a belt length of 20m, which is convenient for farming, and a horizontal ladder belt needs to be built for sloping orchards.
[0019] (2) Digging the planting ditch: the dug planting ditch is 1m long and 0.7m wide. When digging the trench, put the topsoil aside and use it for backfilling.
[0020] (3) Backfill soil: first put the topsoil into the bottom layer, put the bottom fertilizer in 4 layers, one layer of fertilizer and one layer of soil, mix the phosphate fertilizer with the soil and organic fertilizer, and apply the backfill height to 1 / 3 of the ditch, and finally use fertilizer The mound is high, and its height is 40cm higher than the ground surface.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com