Method for determining grouting amount for filling karst caves along shield tunnel in karst stratum
A technology of shield tunneling and determination method, applied in construction and other directions, can solve the problems of inability to determine the volume of karst caves, difficulty in measuring construction operations, and long time consumption.
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2017-01-04
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a method in the technical field of underground engineering, in particular to a method for determining the amount of grout filling in karst caves along shield tunnels in karst strata. Background technique
[0002] With the continuous development of my country's underground engineering construction, a large number of high-speed railways, intercity railways, and urban rail transit are being built, and many tunnel projects need to be constructed in karst strata. The shield method is a commonly used tunnel construction method. Many construction accidents and geological disasters will occur when shield tunneling is carried out in the covered karst stratum covered with sandy soil and silty clay: ground slurry accidents, sinkhole disasters, shield tail grouting loss or failure resulting in excessive Subsidence and other engineering accidents, etc. The karst caves in the vicinity of the tunnel need to be treated before the constructio...
Examples
Embodiment Construction
[0053] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention. Operations that are not specifically described in this embodiment can be performed with reference to the methods already provided in the Summary of the Invention, and will not be repeated here.
[0054] The following is an embodiment of a method for determining the volume of a regional karst cave in a covered karst area.
[0055] A rail transit project is located in Guangzhou City, where covered karst is widely distributed, and the ground along the tunnel is urban traffic arterial roads, residential...