Rock burst early warning method and system in complex geological occurrence environment
A technology of rock burst and complex geology, applied in the field of geotechnical engineering, can solve problems such as increased stress concentration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0072] Such as figure 1 As shown, a method for early warning of rock burst in complex geological occurrence environment includes the following steps:
[0073] S1, establishing a 3D visualized numerical model of complex structural belts;
[0074] S2, according to the three-dimensional visualization numerical model, analyze the stress trigger conditions of sudden changes in the stress field of the geological structure and rock burst;
[0075] S3, analyze and judge the energy surge mechanism of rock burst according to the three-dimensional visualization numerical model;
[0076] S4, according to the analysis results in S2 and S3, based on the analysis method of rock burst precursor information based on the comprehensive discrimination of sensitive parameters such as tectonic stress and energy, the early warning of rock burst is carried out.
[0077] In step S1, the three-dimensional transient electromagnetic method of the mine is used to detect the distribution of geological s...
Embodiment 2
[0122] The following is the application of the rock burst early warning method in the complex geological occurrence environment of the present invention in Zhengli Coal Mine.
[0123] Mine overview:
[0124] Zhengli Coal Mine is affiliated to Shanxi Coking Coal Group Co., Ltd. The mine is located in Gepu Village, Lan County, Luliang City, Shanxi Province. The minefield is about 5.0km long from north to south, 3.2km wide from east to west, and covers an area of 9.26km 2 . Working face layout and roadway support: The current mining area of Zhengli Mine is a mining area, with a strike length of 4.13km, a slope width of 1.74km, and an area of about 7.18km 2 . The main mining face in the first mining area is 14 - 1 101, 14 -1 103 and 14 -1 107 working faces, of which 14 -1 Working face 103 is being recovered, 14- 1 The 107 working face is undergoing excavation of two mining roadways. The mine pressure monitoring stations used in this paper are respectively arranged i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com