A kind of accurate pre-buried water supply and drainage casing and construction method based on bim and aluminum alloy formwork

A technology of aluminum alloy formwork and construction method, which is applied in the direction of pipes, pipe laying and maintenance, pipes/pipe joints/pipe fittings, etc. It can solve the problems of difficult control of position and size, inaccurate casing reservation, and concrete structure damage, etc., to achieve The overall aesthetic effect is good, the energy saving and environmental protection benefits are remarkable, and the effect of reducing rework

Active Publication Date: 2018-09-07
CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] (1). The position size is not easy to control, the error is large, and with the change and replacement of the formwork, the size must be measured again before each concrete pouring, which is not efficient, wastes the construction period, and is prone to errors;
[0009] (2). The reserved casing is easily disturbed or lost during concrete pouring construction;
[0010] (3). For floors with a large number of floors, it is not easy to reserve the upper and lower casings at the same position on a vertical line within an error range, resulting in that the pipe joints are not straight in order to be able to install and connect the pipes during pipe installation. Not sealed;
[0011] (4). Due to the inaccurate reservation of the casing, the floor often needs to be drilled twice, resulting in the destruction of the concrete structure

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of accurate pre-buried water supply and drainage casing and construction method based on bim and aluminum alloy formwork
  • A kind of accurate pre-buried water supply and drainage casing and construction method based on bim and aluminum alloy formwork
  • A kind of accurate pre-buried water supply and drainage casing and construction method based on bim and aluminum alloy formwork

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0060] see figure 1 and figure 2 The aluminum alloy formwork with accurate pre-embedded water supply and drainage casings includes more than two aluminum alloy formworks 1 and water supply casings or drainage casings 2 on the floor bottom.

[0061] see image 3 and Figure 4 , the inner surface of the aluminum alloy formwork 1 on the bottom of the floor is fixed with a positioning snap ring 11 at the position of the set water supply pipe or drain pipe, and the positioning snap ring 11 is perpendicular to the aluminum alloy formwork 1 on the bottom of the floor.

[0062] When constructing concrete floors, the operation steps are as follows:

[0063] (1). Use BIM technology to build models, simulate the installation of water supply and drainage pipelines, conduct collision checks on the location of water supply and drainage pipelines, and deeply optimize the design of water supply and drainage pipeline construction drawings.

[0064] (2). Use BIM technology to design the al...

Embodiment 2

[0071] see Figure 11 , the aluminum alloy formwork with accurate pre-buried water supply and drainage casing includes two sets of wall aluminum alloy formwork 1 corresponding to each other, each group of wall aluminum alloy formwork 1 is composed of more than three wall aluminum alloy formwork 1; water supply is also included Casing or drain casing2.

[0072] Wherein the inner sides of the wall aluminum alloy formwork 3 corresponding to each other are respectively fixed with positioning snap rings 11, the positioning snap rings 11 are perpendicular to the wall aluminum alloy formwork 3, and the positioning snap rings 11 on the wall aluminum alloy formwork 3 on both sides correspond to each other.

[0073] When constructing concrete walls, the operation steps are as follows:

[0074] Steps (1) to (3) are the same as in Example 1.

[0075] Step (4), see Figure 12 and Figure 13 C-C sectional view, after the reinforcement binding of the concrete wall is completed, the alu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Provided is a construction method for accurately embedding a water supply or water drainage casing pipe based on BIM and an aluminum alloy formwork. The construction method comprises the operation steps that 1, a model is built through the BIM technology, position collision checking of the water supply or water drainage casing pipe is conducted, and a water supply or water drainage casing pipe production drawing is deeply optimized and designed; 2, the aluminum alloy formwork of a floor or a wall or a beam where a pipeline passes through is designed through the BIM technology, and pipeline position information data are recorded and stored through a two-dimensional code; 3, the aluminum alloy formwork with a positioning clamp ring is produced according to the information model; 4, the aluminum alloy formwork of the floor or the wall or the beam is installed; and 5, concrete is poured into the floor or the wall or the beam, when the concrete strength meets the requirement, the aluminum alloy formwork is dismounted, and the water supply or water drainage casing pipe is accurately embedded in the concrete structure. The effect that pipelines on the floor are on the same straight line is ensured, and perpendicularity of later pipeline installation is ensured; pipelines on the beam or the wall can be on the same proper slope line, and gradient of later pipeline installation is ensured; and the pipelines can be installed at a time successfully, and rework caused by dimensional deviation is avoided.

Description

technical field [0001] The invention belongs to the technical field of building construction engineering, and in particular relates to a construction component and method suitable for standard floors of similar residential building engineering. Background technique [0002] In housing construction projects, water seepage in floor slabs and basement exterior walls has become a relatively common quality problem in construction projects, and it is difficult to repair and deal with. Most water seepage occurs in bathrooms, balconies and basement exterior walls, and more than 90% of water seepage in these areas is caused by pipes roots. [0003] The construction technicians and construction units of water supply and drainage projects are generally aware that the reserved casing of the pipeline cannot be constructed or constructed according to the drawings due to the deviation of the position and size of the pipeline, so that the hole has to be drilled twice, and some construction ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): F16L1/024F16L5/00
CPCF16L1/0246F16L5/00
Inventor 李明李利
Owner CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products