Construction method of precise intersecting drainage holes in coal mine underground roadway

A technology of underground roadway and construction method, which is applied in the direction of drainage, mining equipment, earthwork drilling and mining, etc., can solve the problems of long cycle, high cost of roadway excavation, heavy pollution, etc. The effect of labor intensity

Active Publication Date: 2019-10-01
XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a construction method for accurately interfacing drainage holes in coal mine underground roadways, which connects the water outlet roadway and the drainage roadway, and adopts the reverse pull-back type reaming process for multi-stage reaming. wall, to achieve the purpose of effective drainage, used to replace the special drainage roadway excavation, to solve the problems of high cost, long cycle and serious pollution of roadway excavation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of precise intersecting drainage holes in coal mine underground roadway
  • Construction method of precise intersecting drainage holes in coal mine underground roadway
  • Construction method of precise intersecting drainage holes in coal mine underground roadway

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings and examples. The following examples are only used to illustrate the technical solutions of the present invention more clearly, but not to limit the protection scope of the present invention.

[0035] see Figure 1 to Figure 5 , shows the construction method of the coal mine underground roadway precisely crossing drainage holes of the present invention.

[0036] The method for constructing precisely opposite drainage holes in underground coal mine roadways includes the following steps:

[0037] Step 1: Drilling preparation, determine the inclination angle and azimuth angle of the drilling hole, among which, the drilling construction design can be carried out according to the drainage requirements of the working face, geological data and precise drilling hole layout requirements to determine the inclination angle and azimuth angle of the dril...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A construction method for accurately penetrating drainage holes in underground tunnels of coal mines, comprising a combination of directional drilling tools for accurate piercing, a back-pulling reaming bit, a wall-protecting steel casing, and the like. The hole trajectory control technology is used to construct accurate piercing holes to connect the outlet roadway and the drainage roadway. After the drilling is pierced, the back-towing reaming bit is replaced without lifting the drill to reversely expand, repeat the multi-stage reaming, and replace it in the opposite roadway. Change the diameter, connect the large-aperture protective casing, use the back-towing type to run the protective casing in the whole process, grouting and solidify, and install the drainage flower pipe for filtering the sundries in the water outlet roadway. Precise piercing and large-diameter casing run in the whole process, so as to effectively replace the excavation construction of special drainage roadway, and greatly reduce the cost of coal mine water hazard control.

Description

technical field [0001] The invention relates to the technical field of construction of drainage holes for water prevention and control in underground coal mines, and in particular to a construction method for precisely piercing drainage holes in underground roadways of coal mines. Background technique [0002] With the gradual deepening of coal mine mining depth and the further expansion of mining scope, the underground geological conditions of coal mines are complex and changeable. It is often necessary to excavate a special drainage roadway before mining at the working face threatened by water damage to prevent water gushing and flooding during the mining process. dangerous situation. However, the excavation process of long-distance special water diversion roadway is time-consuming, costly, and construction efficiency is low. [0003] For this reason, in view of the above-mentioned defects, the designer of the present invention, through painstaking research and design, an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21F16/00
Inventor 石浩张杰王毅陈洪岩黄寒静金新马君奎
Owner XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products