Engineering cost project distribution system and method
A technology of engineering cost and distribution system, applied in the field of management, can solve problems such as slowing down the progress of cost engineering projects, loss of owners, etc., and achieve the effect of improving safety and improving processing efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Such as figure 1 As shown, an engineering cost project distribution system includes a cloud server, an owner terminal, a management terminal, a cost operator terminal, a management system carried on the management terminal, a cost engineer system carried on the cost engineer terminal, and an owner terminal carried on the owner terminal. system. The cloud server communicates interactively with the owner's terminal, management terminal and cost operator's terminal through the network.
[0043] In one embodiment, the management terminal, cost operator terminal and owner terminal can be desktop computers, notebook computers, and tablet computers, and the management system, cost engineer system, and owner system are software embedded in the management terminal, cost engineer terminal, and owner terminal. platform.
[0044] In another embodiment, the management terminal, the cost engineer's terminal and the owner's terminal may be smart phones. The management system, coste...
Embodiment 2
[0060] Such as image 3 As shown, a project cost allocation method includes the following steps:
[0061] S1. Establish several project allocation tables in the cloud server, each project allocation table has a corresponding project schedule time;
[0062] S2, the coster terminal sends a number of fingerprint information to the cloud server in advance, and pairs and binds the number of fingerprint information with a number of project allocation tables one by one and saves them in the database of the cloud server;
[0063] S3, the management terminal publishes the project information in the corresponding project allocation table according to the project progress time;
[0064] S4. When the cloud server receives the fingerprint information sent by the coster's terminal, it retrieves the fingerprint information pre-stored in the database and compares it. If the comparison is successful, it calls the project allocation table that matches the pre-stored fingerprint and randomly se...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com