Engineering cost project distribution system and method

A technology of engineering cost and distribution system, applied in the field of management, can solve problems such as slowing down the progress of cost engineering projects, loss of owners, etc., and achieve the effect of improving safety and improving processing efficiency

Inactive Publication Date: 2017-08-18
浙江华域高宇项目管理有限公司
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Traditional engineering cost companies mainly rely on management personnel to prepare and allocate engineering cost items based on past construction experience, resulting in limitations in the allocation of engineering cost items. If the company as a whole has insufficient cost staff, it will seriously slow down The progress of the cost engineering project, causing losses to the owner

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering cost project distribution system and method
  • Engineering cost project distribution system and method
  • Engineering cost project distribution system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0042] Such as figure 1 As shown, an engineering cost project distribution system includes a cloud server, an owner terminal, a management terminal, a cost operator terminal, a management system carried on the management terminal, a cost engineer system carried on the cost engineer terminal, and an owner terminal carried on the owner terminal. system. The cloud server communicates interactively with the owner's terminal, management terminal and cost operator's terminal through the network.

[0043] In one embodiment, the management terminal, cost operator terminal and owner terminal can be desktop computers, notebook computers, and tablet computers, and the management system, cost engineer system, and owner system are software embedded in the management terminal, cost engineer terminal, and owner terminal. platform.

[0044] In another embodiment, the management terminal, the cost engineer's terminal and the owner's terminal may be smart phones. The management system, coste...

Embodiment 2

[0060] Such as image 3 As shown, a project cost allocation method includes the following steps:

[0061] S1. Establish several project allocation tables in the cloud server, each project allocation table has a corresponding project schedule time;

[0062] S2, the coster terminal sends a number of fingerprint information to the cloud server in advance, and pairs and binds the number of fingerprint information with a number of project allocation tables one by one and saves them in the database of the cloud server;

[0063] S3, the management terminal publishes the project information in the corresponding project allocation table according to the project progress time;

[0064] S4. When the cloud server receives the fingerprint information sent by the coster's terminal, it retrieves the fingerprint information pre-stored in the database and compares it. If the comparison is successful, it calls the project allocation table that matches the pre-stored fingerprint and randomly se...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an engineering cost project distribution system and a method. The technical schemes of the invention comprise: a project management unit comprises a plurality of project distribution sheets with each project distribution sheet provided with progress time corresponding to project; a project publishing unit is used to publish the project information in the corresponding project distribution sheet according to the project progress time; a fingerprint sending unit transmits the fingerprint information to a cloud server according to the fingerprint information recorded by a fingerprint input unit wherein the cloud server further comprises a fingerprint identification unit and a project delivery unit. The fingerprint identification unit is used to receive the fingerprint information so as to call and compare the fingerprint information pre-stored in a database. If the fingerprint information is successfully matched, then, the project delivery unit calls the project distribution sheet that matches the pre-stored fingerprint information, randomly extracts the project information in the project distribution sheet and delivers the project information to the cost maker system.

Description

technical field [0001] The invention relates to the technical field of management, in particular to a project cost item allocation system and method. Background technique [0002] At present, the calculation of project quantity usually adopts the method of manual calculation. Generally, the project technicians and business personnel calculate the project quantity according to the information contained in the construction drawings. Among them, the project cost calculation refers to the cost of previous projects, combined with the project Estimate the cost of the current project. [0003] Traditional engineering cost companies mainly rely on management personnel to prepare and allocate engineering cost items based on past construction experience, resulting in limitations in the allocation of engineering cost items. If the company as a whole has insufficient cost staff, it will seriously slow down The progress of the cost engineering project caused losses to the owner. Conte...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10
CPCG06Q10/103
Inventor 高天宇陈伟高强
Owner 浙江华域高宇项目管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products