Post evaluation method for power grid project based on multilevel extension assessment method
A post-evaluation and project technology, applied in the post-evaluation field of power grid projects based on the multi-level extension evaluation method, can solve the problems of unreasonable weight determination, incomplete index system, and large influence of human subjective factors, etc., and achieve the goal of index weight. Determine the reasonableness, reduce the impact, and evaluate the scientific effect of the result
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] see figure 1 , the present invention provides a technical solution: a post-evaluation method for a power grid project based on a multi-level extension evaluation method, comprising the following steps:
[0047] S1: Establish an evaluation index system;
[0048] S2: Use the improved AHP combined with the entropy weight method to determine the weight of the evaluation index; the traditional AHP scales the importance of 1 / 9, 1 / 7, 1 / 5, 1 respectively / 3, 1 / 1, 3 / 1, 5 / 1, 7 / 1, 9 / 1; the improved AHP of the present invention uses a scale of 0.1-0.9 to construct a judgment matrix, and the final weight size obtained is closer to Actual; the meaning of its scale is shown in Table 1:
[0049] Table 1 The meaning of the scale of the improved AHP
[0050]
[0051] The final weight v of index i in a certain classi (i=1,2,·····,n) is calculated as
[0052]
[0053] In the formula: α i ——The weight of index i in a certain category calculated by the improved AHP
[0054] beta ...
Embodiment 2
[0077] The invention provides a specific example to illustrate: take a 220kV substation construction project as an example to verify the scientificity and rationality of the established multi-level extension evaluation model; Reduced operation and management costs (unattended); since it was completed and put into operation on October 26, 2011, it has been running well without any major accidents; according to the relevant information provided by its operation mode section and equipment department, the substation construction project The actual data of the post-evaluation indicators of functional effects are shown in Table 4.
[0078] According to the scoring rules of China Southern Power Grid Co., Ltd. on the post-evaluation grade division of the project, this paper divides the post-evaluation of the substation construction project into four grades: poor, general, good and good, corresponding to U=(U 1 ,U 2 ,U 3 ,U 4 ), the specific score division of each grade interval is ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com