A construction method and slide-type technology, applied in construction, building maintenance, building construction, etc., can solve the problems of affecting the progress of the maintenance period, consuming manpower and material resources, occupying the full maintenance period, etc., to facilitate disassembly, folding and recycling, and increase the cost. , Efficient removal effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0067] Economic benefit estimation: The amount of random packing removal for this project is about 290 tons.
[0068] If the traditional construction method is adopted, workers fill the woven bags and transport them up and down by the hoist. It is estimated that it will take 300 man-days and 30 shifts of 3t winches. The total cost is 300*200+30*50=61500.
[0069] If the chute type unloading filler construction method is adopted, it is estimated that it will take 150 man-days and the chute cost 10,000 yuan. The total cost is 150*200+10000=40,000 yuan.
[0070] In summary, this project saves 21,500 yuan.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com