A kind of non-excavation construction method of polyethylene pipe
A technology for polyethylene pipes and construction methods, which can be used in artificial islands, water conservancy projects, infrastructure projects, etc., and can solve problems such as ground subsidence, pipe fractures, and pipe surface scratches
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0033] Such as Figure 1 to Figure 3 Shown: this embodiment provides a kind of non-excavation construction method of polyethylene pipe, comprises the following steps:
[0034] 1) Design the guide hole track 1, the guide hole track 1 includes the first inclined section 1a, the horizontal section 1b and the second inclined section 1c connected in sequence;
[0035] 2) Compacting and grouting the foundation soil layer along the wall of the building 2. It should be po...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com