Formwork reinforcing structure at underground pipe gallery horizontal construction joint and construction method
A technology for reinforcing horizontal construction joints and formwork, which is applied to underwater structures, infrastructure engineering, water conservancy projects, etc., can solve the problems of horizontal construction joint misalignment and grout leakage, and achieve convenient construction, reasonable and simple structural design, and improved The effect of perceived quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] like figure 1 As shown, the present invention is a formwork reinforcement structure at the horizontal construction joints of an underground pipe gallery, which includes a plurality of first pairs of pulling screws 1, a plurality of second pairs of pulling screws 2, a plurality of square logs 4, a template 5, a base plate 6 and a steel pipe 7; The bottom plate 6 is provided with a raised guide wall 8, and the top of the guide wall 8 is a construction joint; the first pair of pull screws 1 are arranged at the upper part of the guide wall 8 at equal distances horizontally; both sides of the top of the guide wall 8 The edges are respectively pasted with double-sided tape; the lower part of the template 5 is vertically arranged on the outside of the two double-sided tapes; the square wood 4 is vertically equidistantly arranged on the outside of the two templates 5; the second pair of pulling screws 2 are arranged on the two templates 5 from bottom to top in several rows, the...
Embodiment 2
[0029] A construction method for the formwork reinforcement structure at the horizontal construction joints of the underground pipe gallery described in Embodiment 1, comprising the following steps:
[0030] (1) First, pour the concrete of the bottom plate and the guide wall according to the design drawings, and set the first pair of tension screws at the set position of the guide wall at the same distance horizontally before pouring;
[0031] (2) After the concrete of the bottom plate and the guide wall is poured, the first pair of pulling screws at the guide wall are reserved. The top of the guide wall is the position of the horizontal construction joint of the pipe gallery, and the double-sided tape is pasted on the edges of both sides of the top of the guide wall. , and then set the template on the outside of the two double-sided tapes;
[0032] (3) Arrange several rows of second pairs of pull screws on the two templates from bottom to top. When setting, ensure that the se...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com