Slope excavation and support fast tracking construction method
A construction method and slope technology, applied in excavation, infrastructure engineering, sheet pile wall, etc., to avoid the collapse of the slope, prevent the collapse of the floor, and not delay the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] Take the spillway high slope excavation project of Jinzhai Pumped Storage Power Station in Anhui Province as an example:
[0033] A construction method for rapid follow-up of slope excavation support, comprising the following steps:
[0034] 1: For high slope excavation and support construction, maintain advanced awareness in technology: take the lead in familiarizing with the construction drawings and technical requirements, conduct repeated surveys and measurements on the construction site, determine the construction method of excavation and support, do a good job in wind, water and power layout, and Plan construction roads and slag yards, and make preparations for personnel and equipment.
[0035] 2: The surveying team and the surveying supervision engineer will conduct the original terrain surveying and mapping, and then release the excavation range, slope ratio, elevation and stake number according to the design excavation drawings, spray red spray paint on the hol...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com