Building equipment lease management system and method

A construction equipment and management system technology, applied in the construction equipment leasing management system and management field, can solve the problems of not being able to find equipment rental resources, the market is not wide, and the construction equipment rental is inconvenient, etc., to facilitate communication and realize settlement automation , The effect of ensuring safety and efficiency

Inactive Publication Date: 2018-11-23
四川康思创网络科技有限公司
View PDF8 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide a construction equipment rental management system and management method, which solves the inconvenience of renting existing construction equipment, the difficulty of effectively sharing information, managing and monitoring equipment, and the limited user resources of the lessee and the market Problems that are not broad and users cannot find equipment rental resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building equipment lease management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0069] A construction equipment leasing management system provided by a preferred embodiment of the present invention includes an account management unit, a central control unit connected to the account management unit, and a central control unit respectively connected to the central control unit

[0070] Order management unit: used for placing / receiving orders, viewing order status and online transactions;

[0071] Equipment status unit: used for real-time monitoring of equipment and recording driving tracks;

[0072] Data statistics unit: used to count equipment workload and equipment types.

[0073] Further, the order management unit includes an online order placing / receiving module, an order viewing module connected to the online order placing / order receiving module, and an online transaction module connected to the order viewing module, making full use of the most popular online transaction, which realizes the automation of settlement;

[0074] Online order placing / rece...

Embodiment 2

[0103] On the basis of Embodiment 1, the system also includes an aftermarket management unit connected to the central control unit, and the aftermarket management unit includes an insurance management module, a maintenance management module connected to the insurance management module, and a maintenance management module connected to the maintenance management module. other service modules of the ;

[0104] Insurance management module: used to register and check the insurance type, insurance amount and insurance period of construction equipment;

[0105] Maintenance management module: used to register safety inspection and maintenance records of construction equipment;

[0106] Other Services Module: For registering construction equipment refueling, operator change related services.

[0107] A construction equipment leasing management method, comprising the following steps:

[0108] Step 1: The user or lessee registers an account on the mobile terminal, fills in the basic in...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a building equipment lease management system and method, and belongs to the field of intelligent management of building equipment. The system comprises an account management unit, a central control unit connected with the account management unit, an order management unit used for placing / receiving an order, viewing an order state and performing online trading, an equipmentstate unit used for monitoring the equipment and recording a running track in real time, and a data statistics unit used for performing statistics on equipment workloads and equipment types, wherein the order management unit, the equipment state unit and the data statistics unit are connected with the central control unit. According to the building equipment lease management system and method, theproblems that existing building equipment is inconvenient to lease, operations of effectively sharing information and managing and monitoring the equipment are difficult, user resources of lessees are limited, the market is not wide, and users cannot find equipment lease resources are solved.

Description

technical field [0001] The invention belongs to the field of intelligent management of construction equipment, and relates to a construction equipment leasing management system and a management method. Background technique [0002] With the progress of social economy and the increase of intelligent products, some car rental systems and bicycle rental systems have appeared, but there is no intelligent management system for construction equipment. [0003] Construction equipment is bulky and expensive. It is definitely not cost-effective for general users to buy it when they need it. Therefore, some businesses rent out the purchased construction equipment, usually through introductions by acquaintances or handing out leaflets. There are certain disadvantages. There are limited resources, small circles, and not a broad market through the introduction of acquaintances. However, distributing leaflets requires a lot of manpower and financial resources, and because people are not v...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q30/06G06Q40/08
CPCG06Q30/0645G06Q40/08
Inventor 胡敬红
Owner 四川康思创网络科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products