Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology of dust-proof device and green building, applied in the direction of building, building components, building structure, etc., can solve the problems of occupying construction site, flying noise of dust, dust and sand in the air, and hindering normal construction.
Active Publication Date: 2019-08-09
山东润耀环保科技有限公司
View PDF5 Cites 1 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0004] At present, during the construction process, some construction waste is directly thrown from high places onto the construction site, causing dust, dust and sand flying in the air and a lot of noise, which seriously pollutes the environment around the construction site; during the construction of multi-storey buildings, the generated Construction waste needs to be transported to the ground for transfer and disposal in a timely manner, otherwise it will occupy the construction site and hinder the normal construction
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0050] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples or drawings are used to illustrate the present invention, but not to limit the scope of the present invention.
[0051] Such as figure 1 , 2 As shown, it includes a first channel unit 1, a second channel unit 2, an adjustment mechanism 3, and a dustproof mechanism 4, among which Figure 5 As shown, a plurality of first channel units 1 are evenly combined up and down through the fixed structure 6, as figure 1 As shown, the lower side of the first channel unit 1 located on the lowermost side is equipped with a second channel unit 2 through a fixed structure 6; image 3 , 4 As shown, the first passage unit 1 positioned at the uppermost end is fixed on the side wall of the building through a fixed support structure 5, and each first passage unit 1 corresponds to a floor, and the secon...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
PUM
Login to view more
Abstract
The invention belongs to the technical field of building garbage recovery, and particularly relates to a green building garbage recovery anti-dust device. The green building garbage recovery anti-dustdevice comprises a first channel unit, a second channel unit, an adjustment mechanism and an anti-dust mechanism. When a building garbage recovery channel is used, thrown building garbage absorbs a part of impact force of the falling building garbage through swinging of a swinging baffle and friction of the building garbage and the swinging baffle, the impact force of the building garbage being in contact with the ground is reduced, and the damage degree of the ground caused by larger impact of the building garbage and the ground is reduced; and the building garbage can be prevented from generating dust in the impact process, and meanwhile, the building garbage impacted with the ground is prevented from bouncing again to damage or crash surrounding people or buildings. According to the green building garbage recovery anti-dust device, the anti-dust mechanism, a first channel shell and a second channel shell are arranged, dust and sand dust generated in the building garbage falling process can be prevented from being diffused into surrounding air to pollute the environment.
Description
[0001] Technical field [0002] The invention belongs to the technical field of construction waste recycling, and in particular relates to a dust-proof device for recycling green construction waste. Background technique [0003] Construction waste refers to the dregs, spoils, waste materials, residual mud and other wastes generated during the construction, laying or demolition, and repair of various buildings, structures, pipe networks, etc. by construction units or individuals; According to the source of generation, construction waste can be divided into engineering dregs, decoration waste, demolition waste, engineering mud, etc.; according to the composition, construction waste can be divided into muck, concrete blocks, crushed stones, Waste mortar, mud, asphalt block, waste plastic, waste metal, waste bamboo and wood, etc.; with the acceleration of industrialization and urbanization, the construction industry is also developing rapidly at the same time, and the accompanying...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.