Engineering project management method and system

A technology of engineering projects and management methods, applied in the field of engineering project management methods and systems, can solve problems such as low management efficiency and data leakage, and achieve the effects of convenient operation, improved safety, and increased complexity

Inactive Publication Date: 2019-10-18
HOHAI UNIV
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The current engineering project management is generally done manually, the management efficiency is low, and it is easy to cause data leakage

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering project management method and system
  • Engineering project management method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.

[0030] See Figure 1-2 , The present invention provides a technical solution: an engineering project management method, including the following steps:

[0031] A. The user first performs identity verification through face recognition and fingerprint recognition, and then enters the project system through the login page after the verification is passed;

[0032] B. The user performs editing operations through the touch screen, and enters the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an engineering project management method and system, and the method comprises the following steps: A, carrying out the identity verification of a user through face recognitionand fingerprint recognition, and carrying out the engineering project system through a login page after the verification is passed; B, performing editing operation by a user through a touch display screen, and entering an engineering project adding page to add an engineering project; C, after the engineering project is added, entering a project data acquisition page to acquire engineering progressinformation; D, sending the collected information to a data analysis system, and sorting and classifying engineering data for analysis; E, sending the project data added in the step B and the analysis data in the step D to a memory for encrypted storage; and F, finally sending the encrypted and stored data to a background management center. The invention is simple in structure principle and convenient to operate, can realize tracking management of the engineering project, can avoid data leakage of the engineering project, and improves the enterprise benefit.

Description

Technical field [0001] The invention relates to the technical field of project management, in particular to an engineering project management method and system. Background technique [0002] A construction project is a project with construction as a carrier, and a one-time construction task as a managed object. It takes buildings or structures as the target output. It needs to pay a certain fee, follow a certain procedure, complete it within a certain time, and meet the quality requirements. [0003] The so-called project management refers to the effective management of all the work involved in the project by the project manager under the constraints of limited resources, using systematic viewpoints, methods and theories. That is to plan, organize, direct, coordinate, control, and evaluate the whole process from the beginning of the investment decision of the project to the end of the project, so as to achieve the set goals of the project with the highest possible efficiency. [00...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F21/60G06F21/62G06F21/32G06Q10/10G06Q50/08
CPCG06F21/32G06F21/602G06F21/6209G06Q10/103G06Q50/08
Inventor 郁泽虎
Owner HOHAI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products