Safety early warning method for deep foundation pit excavation and construction

A technology for deep foundation pits and foundation pits, applied in excavation, infrastructure engineering, alarms, etc., can solve problems such as small safety reserves, and achieve the effect of preventing collapse accidents, ensuring construction safety, and ensuring safety.

Pending Publication Date: 2019-11-26
江苏博望建设有限公司
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The construction safety method of deep foundation pit is temporary, with a small safety reserve and great risk. Therefore, in the process of deep foundation pit work, safety inspection and early warning are an indispensable and important link, and it is even more important for construction safety. important guarantee, for this reason, we propose a safety early warning method for deep foundation pit excavation and construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Safety early warning method for deep foundation pit excavation and construction
  • Safety early warning method for deep foundation pit excavation and construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the specific embodiments of the present invention will be described below in conjunction with the accompanying drawings.

[0015] Such as Figure 1-2 As shown, a method for deep foundation pit excavation and construction safety early warning, including analysis of main causes of engineering accidents, deep foundation pit design and construction safety analysis, deep foundation pit engineering construction safety monitoring and early warning management and safety control, said Analysis of the main causes of engineering accidents includes inadequate engineering survey, small design safety reserves, improper selection of support schemes, improper waterproof and drainage measures, and improper waterproof and drainage measures. The safety monitoring of deep foundation pit engineering construction includes the construction safety monitoring of deep f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a safety early warning method for deep foundation pit excavation and construction. The method comprises main reason analysis of engineering accidents, deep foundation pit design and construction safety analysis, and deep foundation pit engineering construction safety monitoring and early warning management and safety control. The main reason analysis of the engineering accident comprises improper engineering investigation, small designed safety reserve, improper selection of a supporting scheme, improper waterproof and drainage measures and improper waterproof and drainage measures. The deep foundation pit engineering construction safety monitoring comprises deep foundation pit engineering construction safety monitoring, deep foundation pit engineering constructionsafety monitoring and deep foundation pit engineering construction safety monitoring. According to the safety early warning method for deep foundation pit excavation and construction, through real-time safety detection, the safety of the foundation pit can be monitored preferentially, safety early warning can be conducted in time, the safety of the foundation pit structure is guaranteed, collapseaccidents of the foundation pit are prevented, construction safety is guaranteed, and better use prospects are brought.

Description

technical field [0001] The invention relates to the field of deep foundation pit excavation and construction safety early warning methods, in particular to a deep foundation pit excavation and construction safety early warning method. Background technique [0002] The construction safety method of deep foundation pit is temporary, the safety reserve is small, and it has great risk. Therefore, in the process of deep foundation pit work, safety detection and early warning are an indispensable and important link, and it is the most important part of construction safety. An important guarantee, for this reason, we propose a safety early warning method for deep foundation pit excavation and construction. Contents of the invention [0003] The main purpose of the present invention is to provide a safety warning method for deep foundation pit excavation and construction, which can effectively solve the problems in the background technology. [0004] In order to achieve the above...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08E02D17/02G08B31/00
CPCG06Q10/0635G06Q50/08E02D17/02G08B31/00
Inventor 方贻弘
Owner 江苏博望建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products