Supercharge Your Innovation With Domain-Expert AI Agents!

Settlement control device and method for pipe jacking under construction of existing operating railway

A settlement control and railway technology, applied in roads, buildings, measuring instruments, etc., can solve the problems of increasing construction difficulty, large settlement of railway tracks in operation, train delays, etc., and achieve the effect of simple layout method, high construction efficiency, and rapid layout.

Active Publication Date: 2021-09-28
XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
View PDF22 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Pipe jacking under the existing operating railway often causes adverse effects, such as causing excessive settlement of the existing operating railway track, which threatens operational safety. In addition, the existence of the upper traffic load also has an adverse impact on the construction of the lower pipe jacking, increasing construction difficulty and seriously slow down construction progress
At present, some auxiliary construction measures have been developed for pipe jacking under the existing operating railways, such as reducing the frequency of train operations, reducing the speed of trains, and strengthening the soil below the railway through grouting. Although these existing measures have some effects, they are still It also has its inherent disadvantages, such as reducing the frequency of train operation or reducing the speed of train operation, which will affect the train operation plan and even cause train delays; the reinforcement of soil by grouting often has poor control of grouting pressure, resulting in poor grouting effect. Poor or excessive grouting pressure causes rail uplift, which also poses a certain threat to driving
With more and more infrastructure facilities, there are more and more cases of pipe jacking passing through existing railways. At present, there is no better settlement control method for pipe jacking passing through existing operating railways

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Settlement control device and method for pipe jacking under construction of existing operating railway
  • Settlement control device and method for pipe jacking under construction of existing operating railway

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The present invention will be further described below in conjunction with accompanying drawing.

[0029] see figure 1 and figure 2 , a settlement control device for pipe jacking under the existing operating railway construction, including a settlement measurement unit and a settlement control unit;

[0030] The settlement measurement unit includes a base point 1, several laser pointers 3 and several screen scales 4, the base point 1 is fixed on the ground not affected by settlement, all screen scales 4 are distributed on the sleeper 7, all laser pointers 3 are fixed on the base point 1, and the base point 1 Connect all the laser pointers 3 through the support rod 2, the laser pointer 3 points to the corresponding screen scale 4, the height of each screen scale 4 is different, and the height of the laser pointer corresponding to each screen scale 4 is adjusted through the vertical bar;

[0031] The settlement control unit includes a number of airbags 5 arranged in the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a settlement control device and method for pipe jacking under the construction of an existing operating railway. The invention sets a settlement measurement unit on the sleeper, and uses a laser pen to locate on the screen scale. When the sleeper collapses or bulges, The screen ruler at the corresponding position will rise or fall, thereby changing the position of the laser pointer, and the screen ruler will send the changed data to the control unit to collect the deformation of the sleeper; by setting the settlement control unit in the soil below the sleeper, the When the sleeper subsides or uplifts, the control unit collects the subsidence or uplift data, and determines the screen scale corresponding to the deformation, and controls the airbag at the corresponding position to inflate or deflate, so as to achieve the purpose of straight packaging track. The construction situation of the existing railway under the pipe jacking ensures the straightness of the track and avoids the impact on the vehicles on the track caused by the subsidence or uplift of the ground surface during construction.

Description

technical field [0001] The invention belongs to the field of pipe jacking construction, and in particular relates to a settlement control device and method for pipe jacking under construction of existing operating railways. Background technique [0002] In recent years, the transportation infrastructure has achieved unprecedented development. More and more railways, highways, subways and pipes and culverts have been put into construction. With so many projects, it is inevitable that existing construction will pass under or over existing buildings. In the case of pipe jacking, it is a typical form to pass under the existing operating railway. [0003] Pipe jacking under the existing operating railway often causes adverse effects, such as causing excessive settlement of the existing operating railway track, which threatens operational safety. In addition, the existence of the upper traffic load also has an adverse impact on the construction of the lower pipe jacking, increasin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01B35/00E01B2/00
CPCE01B2/00E01B35/00E01B2204/06
Inventor 张玉伟宋战平王军保牛泽林周冠南范胜元田小旭
Owner XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More