Offshore water sound positioning beacon throwing method, recovery method and withdrawing and placing method
Patent Information
- Authority / Receiving Office
- CN Β· China
- Current Assignee / Owner
- CHINA NAT OFFSHORE OIL CORP
- Publication Date
- 2020-01-10
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
Technical field
[0001] This article relates to offshore drilling platform equipment technology, especially a positioning beacon delivery method, a positioning beacon recovery method, and a positioning beacon retracting method. Background technique
[0002] Offshore drilling platforms need to place positioning beacons for positioning operations before offshore drilling operations, and need to retrieve positioning beacons after drilling operations are completed.
[0003] At present, positioning beacons are launched and recovered by underwater robots (underwater robots referred to as ROVs) that carry positioning beacons up and into the water. The speed of ROV up and down is about 1000 meters per hour. According to statistics, ROV launching and launching time generally account for 50% to 70% of the total labeling operation time, and the proportion increases with the increase of operating water depth, which seriously affects the timeliness of drilling operations.
[0004] Taking the oper...