Cascade reservoir ecological random optimization scheduling model and solving method

A cascade reservoir and stochastic optimization technology, applied in instruments, complex mathematical operations, data processing applications, etc., can solve problems such as the deterioration of river ecological environment, the destruction of natural laws of river hydrological changes, and the impact of river ecological environment.

Active Publication Date: 2020-03-13
YICHANG POWER SUPPLY CO OF STATE GRID HUBEI ELECTRIC POWER CO LTD
View PDF12 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the actual operation of the reservoir, in order to improve the benefits of power generation, the natural runoff of the river where the reservoir is located is often changed, which

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cascade reservoir ecological random optimization scheduling model and solving method
  • Cascade reservoir ecological random optimization scheduling model and solving method
  • Cascade reservoir ecological random optimization scheduling model and solving method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] An ecological stochastic optimal scheduling model of cascade reservoirs, the objective function of which is:

[0048]

[0049] Where: f * is the square of the minimum AAPFD expected value of cascade reservoirs, N is the number of cascade hydropower stations, T is the total number of periods in the dispatching cycle, N s is the discrete state number of inflow runoff, R n,t is the indicator function of the nth reservoir in the tth time period, f n,t is the AAPFD value of the nth reservoir in the tth period;

[0050] R n,t , f n,t The expression looks like this:

[0051]

[0052] Where: V n,i is the water level corresponding to the state i of the nth level power station, is the outflow flow of the nth level power station in the tth period, is the discrete j inflow flow values ​​of the nth reservoir in the t period, and j and k are the state transitions between the inflow runoff, is the outflow flow of the nth reservoir in the tth period, is the inflow r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a cascade reservoir ecological random optimization scheduling model and a solving method. The establishment of the optimization scheduling model comprises the following steps:firstly, establishing a cascade reservoir ecological random scheduling model target function with the minimum corrected annual flow deviation AAPFD index; secondly, describing constraint conditions ofthe cascade reservoir ecological random scheduling model, wherein the constraint conditions comprise a water level constraint, a discharge flow constraint, a reservoir capacity constraint and a guaranteed output constraint. The ecological random scheduling model is solved by utilizing an SARSA algorithm in reinforcement learning, so that the problem of dimensionality disasters caused by a randomdynamic programming algorithm can be solved. The method can improve the ecological demands on the premise of guaranteeing the output of the cascade reservoir hydropower station, and has higher guidingsignificance for the ecological utilization of reservoir water resources. Meanwhile, the proposed SARSA algorithm can well obtain the result of the cascade reservoir random ecological optimization scheduling model in a short time.

Description

technical field [0001] The invention discloses an ecological stochastic optimal scheduling model of cascade reservoirs and a solution method thereof, belonging to the field of optimal scheduling of reservoirs. Background technique [0002] As the renewable energy with the most mature technology and the largest development scale, hydropower plays an important role in the global power energy supply due to its low operating cost, good regulation performance and fast load response capability. Reservoirs have beneficial functions such as power generation, flood control, and irrigation. However, in the actual operation of the reservoir, in order to improve the benefits of power generation, the natural runoff of the river where the reservoir is located is often changed, which destroys the natural law of the river's hydrological changes, has a great impact on the ecological environment of the river, and causes the ecological environment of the river to deteriorate. As my country ac...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06G06F17/11G06F17/16
CPCG06Q10/04G06Q10/0631G06Q50/06G06F17/11G06F17/16
Inventor 李黄强童华敏许阳刘江鹏王炜徐康
Owner YICHANG POWER SUPPLY CO OF STATE GRID HUBEI ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products