Controllable rigid pile and squeezed gravel pile combined composite foundation and construction method thereof
A composite foundation and rigid pile technology, applied in foundation structure engineering, sheet pile wall, soil protection, etc., can solve the problems of shear sliding deformation, poor foundation stability, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] see figure 1 and figure 2 , a controllable rigid pile 4 and compacted sandstone pile 7 composite foundation in a preferred embodiment of the present invention, including a soft soil foundation 1, a sand cushion layer 2 laid on the soft soil foundation 1, and a sand cushion layer arranged on the sand cushion layer 2 the drainage ditch 3 on the outside;
[0044] A plurality of rigid piles 4 are evenly arranged in the soft soil foundation 1, and the tops of the rigid piles 4 are not higher than the soft soil foundation 1 surface; the rigid piles 4 are provided with sleeves 5, and the sleeves 5 The top end extends upwards to the top surface of the sand cushion 2, and the bottom end of the sleeve 5 shrinks to cover the rigid pile 4;
[0045] The sleeve 5 is respectively connected to the grouting pipeline and the grouting pipeline; the sleeve 5 is injected with cement slurry, and the sleeve 5 is provided with a cover plate 6;
[0046] A plurality of gravel piles 7 are eve...
Embodiment 2
[0056] Taking the soft soil foundation 1 under the embankment 17 as the implementation object, the construction method of the composite foundation combined with the controllable rigid pile 4 and the compacted sandstone pile 7 includes steps:
[0057] (1) Level the site first, pave and fill a sand cushion 2 with a thickness of not less than 500mm on the surface of the soft soil foundation 1, and the outer edge of the sand cushion 2 is connected with the drainage ditch 3;
[0058] (2) Construct sand and gravel piles 7 on the sand cushion 2, vertically, from the shallower part of the soft soil foundation 1 to the deeper construction, and for structures such as bridgeheads or culverts, start from the adjacent structures and move away from the structures. Construction in the direction of the object; in the horizontal direction, the folding line method of left and right back and forth is adopted, and the method of first two sides and then the middle can also be adopted. The design l...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com