Subway shield interval short-distance underneath pass pipe-jacking tunnel settlement control standard setting method
A technology of subway shield and control standards, used in tunnels, earth-moving drilling, instruments, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.
[0043] Such as figure 1 As shown, this embodiment provides a method for formulating the settlement control standard of the subway shield section under the short-distance pipe-jacking tunnel, which is carried out according to the following steps:
[0044] (1) First, carefully study the engineering survey and design data, select the key mileage section of the project to establish a numerical simulation calculation model, and select stratum and structural parameters according to the survey data.
[0045] In this embodiment, the existing pipe-jacking tunnel is a municipal road pipe-jacking tunnel, which consists of 4 pipe-jacking tunnels, including 2 non-motor vehi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com