Novel mine old slope ecological restoration process
A technology of ecological restoration and new technology, which is applied in the direction of basic structure engineering, fences, sheet pile walls, etc., can solve the problems of not being suitable for tree growth, unable to form slope greening into pieces, and low pressure bearing capacity of gravity retaining walls
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] Before the construction, a safety rope or rod should be set above the bottom line of the step slope, so that it is convenient to hang the safety belt, and the workers wear the safety belt to carry out the anchor construction; the anchor construction must first measure the positioning, and then drill the inclined inward anchor hole, cement mortar Anchoring, the exposed length is appropriate; after the anchor is anchored, according to the position of the anchor, excavate, fill and level the frame foundation, lay mortar or concrete cushion, lift the frame in place, and lock the frame with the anchor plate and nut; at the same time, install the temporary Guardrails, temporary guardrails also serve as limit bars to fix the frame spacing and orientation; approximately 10-15 sub-frames are set at intervals, and a drainage frame is set.
[0027] After the frame and temporary guardrail are installed, the safe working conditions of the steps are formed; after that, it is recommend...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com