Construction method for super-large section and transition section of road tunnel bifurcation
A super-large cross-section, road tunnel technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of many temporary supports, high construction risks, and difficulties in dismantling supports
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0031] As shown in the figure, the construction method of the super large section and the gradual transition section of the bifurcation part of the highway tunnel in this embodiment includes the following steps:
[0032] 1) Excavate from the end of the branch road on the right side of the tunnel to the direction of the transition section, such as figure 2 As shown, the upper right pilot pit 1 is excavated in the large section section, and the upper right pilot pit extends obliquely from the end of the right branch road of the tunnel to the arc top at the beginning of the transition section.
[0033] 2) Apply temporary support to the upper right pilot pit dug out in step 1).
[0034] 3) Dig horizontally forward into the gradient section of the tunnel from the step on the upper right pilot pit of the large section section, such as image 3 As shown in ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com