Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for super-large section and transition section of road tunnel bifurcation

A super-large cross-section, road tunnel technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of many temporary supports, high construction risks, and difficulties in dismantling supports

Active Publication Date: 2021-04-06
CHONGQING UNIV +1
View PDF12 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of this, the purpose of the present invention is to provide a construction method for the super-large section and the gradual change section of the bifurcation part of the highway tunnel, so as to solve the problem that there are many temporary supports in the super-large section and the gradual change section of the tunnel bifurcation section excavated in the prior art, and the support needs to be disassembled. Difficult, large span, large free space, high construction risk and other technical problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for super-large section and transition section of road tunnel bifurcation
  • Construction method for super-large section and transition section of road tunnel bifurcation
  • Construction method for super-large section and transition section of road tunnel bifurcation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0031] As shown in the figure, the construction method of the super large section and the gradual transition section of the bifurcation part of the highway tunnel in this embodiment includes the following steps:

[0032] 1) Excavate from the end of the branch road on the right side of the tunnel to the direction of the transition section, such as figure 2 As shown, the upper right pilot pit 1 is excavated in the large section section, and the upper right pilot pit extends obliquely from the end of the right branch road of the tunnel to the arc top at the beginning of the transition section.

[0033] 2) Apply temporary support to the upper right pilot pit dug out in step 1).

[0034] 3) Dig horizontally forward into the gradient section of the tunnel from the step on the upper right pilot pit of the large section section, such as image 3 As shown in ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a super-large section and a transition section of a road tunnel bifurcation, and belongs to the technical field of tunnel engineering. The construction method comprises the steps that 1) excavation is conducted from the end of a bifurcation way on the right side of a tunnel to the transition section, and an upper right pilot tunnel is excavated in a large section; 2) temporary support is conducted on the upper right pilot tunnel excavated in the step 1); 3) the transition section of the tunnel is excavated forwards horizontally from an upper step of the upper right pilot tunnel of the large section, and an upper step of a pilot tunnel on the right side of the transition section is formed after a certain distance is excavated; and 4) primary support is conducted on the upper right pilot tunnel excavated in the step 3), and meanwhile locking opening reinforcing and the like are conducted. According to the construction method for the super-large section and the transition section of the road tunnel bifurcation, the pilot tunnel is adopted to penetrate through the super-large section in advance, and support of the head section and the tail section of the super-large section is strengthened; through the special excavation method and the support mode, the safety of the excavation process can be ensured, and the situations of excessive vault settlement, arch wall convergence, unstable arch springing, serious heaving floor and the like caused by the fact that the section is too large can be avoided; and compared with an existing excavation method, the construction method has the advantages that the number of temporary supports is small, and support dismounting is easier.

Description

technical field [0001] The invention relates to the technical field of tunnel engineering, in particular to a construction method for a super-large section and a gradual transition section of a bifurcation part of a hard surrounding rock tunnel. Background technique [0002] When the excavation section in underground engineering (including tunnel engineering) is large, it is called a large section. In construction engineering, the force of large section excavation is relatively unfavorable. The International Tunnel Association defines a super-large cross-section with a clear cross-sectional area / ㎡ greater than 100. [0003] In the construction process of tunnels with super-large cross-section and hard surrounding rock, the traditional excavation methods are double-side-wall pilot-pit method, CD method, CRD method, etc. For the intersection of two small-section tunnels to form a super-large-section tunnel, and then to a gradual tunnel with a gradually smaller cross-section, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/00
CPCE21D9/00E21D11/00
Inventor 任松李永强宋书一王乐郭伟胡明何若蘭全树言
Owner CHONGQING UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products