Low-temperature standardized sample preparation device and method for ice-soil mixture
A hybrid and low-temperature technology, applied in the field of geotechnical engineering, can solve problems such as failure to operate normally, inhomogeneous samples, and unsuitable preparation of ice-soil mixtures, etc., to achieve uniform performance, convenient operation, and good uniformity Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as figure 1 A low-temperature standardized sample preparation device for ice-soil mixture shown includes a loading part 1 , a constant temperature box 2 , a sample preparation bucket 3 and a temperature control part 4 . The loading part 1 is installed on the supporting frame 13, which stands on the supporting platform 14, and the stress ring 5 is set under the loading part 1, and the actual loading distance can be calculated through the value on the ring and the actual loading rate, that is, the telescopic length of the telescopic rod . The lower part is an incubator 2, and a sample preparation device is placed in the incubator 2. There is an interlayer inside the box, and a spiral diversion tube 7 is placed in the interlayer, so that the incubator 7 can pass through to cool down the interior of the incubator 2. The guide tube 7 is connected to the external temperature control component 4 .
[0031] The loading part 1 includes a control module and a loading modul...
Embodiment 2
[0035] Utilize the device described in embodiment 1 to carry out the low temperature standardization sample preparation of ice-soil mixture, concrete steps are as follows:
[0036] At the beginning of sample preparation, the telescopic rod is retracted to the bottom of the stress ring 5, and the top of the incubator 2 is opened through the first handle 211 and the second handle 212, and the ice-soil mixture is loaded into the sample barrel 3, and then the incubator 2 is closed; 1 Obtain the loading signal through the loading setting, and transmit the loading signal to the stress ring 5; the stress ring 5 calculates and controls the telescopic length of the telescopic rod 6 according to the loading signal, and uses the telescopic function of the telescopic rod 6 to adjust the ice- The soil mixture was compressed for sample preparation. Such as figure 2 As shown, the pressure of the telescopic rod 6 acts on the briquetting block 8, and the pressure of the telescopic rod 6 is r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com