Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Super high-rise post-cast floor steel bar reserved formwork and construction method thereof

A technology of super high-rise and steel formwork, which is applied in the direction of formwork/formwork/work frame, connectors of formwork/formwork/work frame, and on-site preparation of building components, which can solve the impact of overall pouring strength, gluten and bottom Ribs are easy to fit, construction personnel are inconvenient, etc., to ensure the quality of pouring construction and the overall economic benefits of construction, fixed and reliable, and reduce construction costs

Pending Publication Date: 2022-03-25
THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The above-mentioned method 1 has a huge amount of work and high additional investment; method 2 and method 3 reserved steel bars will be easily bonded together due to factors such as the inability of the steel bars to be fixed firmly during construction and the vibration deviation during concrete pouring. The spacing in the horizontal direction is uneven, and the spacing of the gluten and bottom bars in the vertical direction does not meet the design requirements, so that many of the reserved steel bars cannot be used, and the follow-up still needs to be planted. The deep groove formed by the chisel will affect the overall stress of the structure, and during the pouring construction process, the position of the steel bar may be shifted. The common method is to use iron wire binding, which is too complicated to operate and affects the construction efficiency. Inconvenient, and has an impact on its overall pouring strength, resulting in overall stability that cannot meet actual construction needs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Super high-rise post-cast floor steel bar reserved formwork and construction method thereof
  • Super high-rise post-cast floor steel bar reserved formwork and construction method thereof
  • Super high-rise post-cast floor steel bar reserved formwork and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The technical solutions in the embodiments of the present invention will be clearly and completely described below. The embodiments of the present invention and all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0033] see Figure 1 to Figure 9 , the present invention provides a technical solution: a super-high-rise post-cast floor reinforcement reserved formwork, the present invention includes a core tube shear wall 1, a steel formwork 2, a double groove 3, a formwork secondary keel 4 and a concave fixing plate 6, Active rod 7, pressing plate 8, positioning assembly 10, clamping assembly 11;

[0034] One side of the core tube shear wall 1 is fixed with a formwork sub-keel 4, and one side of the formwork sub-keel 4 is fixed with a steel formwork 2. The steel formwork 2 is provided with double grooves 3, and the double grooves 3 are equidistantly arranged with ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a super high-rise post-cast floor steel bar reserved template, which is very stable and firm in fixation of reserved steel bars, ensures that the reserved steel bars have very good stability in the subsequent pouring construction, and ensures the pouring construction quality and the overall construction economic benefit, and through a construction method of the super high-rise post-cast floor steel bar reserved template, the construction efficiency is improved, and the construction cost is reduced. A core tube shear wall formwork is innovated and transformed, double grooves of a post-pouring floor slab reserved steel bar are additionally formed in the upper side of the formwork, and an L-shaped steel bar is reserved on the outer side of a core tube shear wall structure, so that steel bar planting-free and chiseling-free construction of the post-pouring floor slab reserved steel bar is achieved, the forming quality of the reserved steel bar is effectively guaranteed, the reserved steel bar is accurately positioned, and the construction efficiency is improved. The influence of chiseling on the overall stress of the structure is reduced, the construction cost is reduced, and the construction efficiency is improved; the device can be repeatedly used, and benefits are remarkable.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a super-high-rise post-poured floor reinforcement reserved formwork and a construction method thereof. Background technique [0002] In recent years, with the growth of the economy and the advancement of construction technology, urban super high-rise buildings with limited construction land have sprung up like mushrooms; at present, most of the super high-rise buildings under construction are in the form of core tube shear wall-outer frame The steel concrete frame structure is subject to the sequence of the vertical cross-operation of the internal and external structures of the core tube. The internal and external floors of the tube usually lag behind the core tube shear wall structure by more than 8 floors, so as to ensure the orderly progress of the construction work; therefore, in the core tube During the construction of the tube shear wall, the steel bars used t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G11/06E04G13/00E04G17/00
CPCE04G11/06E04G13/00E04G17/00
Inventor 钱起飞李玉龙韩天龙惠安辉李成章陈辉
Owner THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products