Construction of a Tubular at a Downhole Location
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
first example embodiment
OF THE INVENTION
[0065]FIG. 3 contains an illustration of a first example embodiment of the present invention. A drilling machine 301 is positioned in a main well 302 using a main cable 304. When the drilling machine 301 is at a proper depth in the main well 302, the drilling machine 301 is oriented in a proper azimuthal position.
[0066]Once the drilling machine 301 is at the proper depth with the proper azimuthal position, the drilling of the lateral hole 303 starts. If the main cable 304 is not rigid enough to keep the azimuthal position during the full operation, it may be needed to clamp the drilling machine 301 in the main well 302.
[0067]The drilling is performed using a drill bit 307 located at an end of a drill string 305a.
[0068]The drilling is performed in a direction of elongation forming a determined angle with the main well 302. In this embodiment, the direction of elongation is substantially perpendicular to a longitudinal direction of the main well 302. Hence the lateral...
second example embodiment
OF THE INVENTION
[0099]FIG. 9 illustrates a second example embodiment of the present invention. A drilling machine 901 is positioned at a determined depth in a main well 902. A lateral hole 903 is drilled using the drilling machine. The lateral hole is cased with a tubular 905 that is constructed from a reserve of material. The reserve of material has a size adapted to be stored within the drilling machine 901. The reserve of material contains at least one storage roll 906. Each storage roll 906 encloses a band of metal 914 following a spiral. The tubular is constructed by wrapping the band of metal 914. The wrapped band of metal 914 is jointed by a jointing device 915 just before leaving the drilling machine 901. The constructed tubular 905 is positioned in the drilled lateral hole 903 and is used as a drill string at an end of which a drill bit 907 drills the lateral hole 903.
[0100]Unlike the example embodiment illustrated in FIG. 3, the storage rolls 906 stay perpendicular to a lo...
third example embodiment
OF THE INVENTION
[0102]FIG. 10 illustrates a third example embodiment of the invention. A lateral hole 1003 departing from a wall of a main well 1002 at a determined depth in a direction substantially perpendicular to a longitudinal direction of the main well 1002 is drilled using a drilling machine 1001. A tubular 1005 is constructed downhole and is positioned in the lateral hole 1003. The tubular 1005 is also used during the drilling. The drilling is performed using a drill bit 1007 located at an end of the positioned tubular 1005.
[0103]The tubular 1005 is constructed by wrapping a band of metal 1014. The band of metal 1014 is stored at a surface location in a storage roll 1006. The band of metal 1014 is unwrapped from the storage roll 1006 at surface. The band of metal 1014 is brought through the main well 1002 to the determined depth following a long shaft 1013.
[0104]A jointing device 1015 located at an intersection of the main well 1002 and the lateral hole 1003 performs a joint...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Size | aaaaa | aaaaa |
| Elongation | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 