Spare water-blocking dam for segment fixation hole and seam leakage flashboard detachable automatic alarm switch gate
An automatic alarm and dam technology, applied in water conservancy projects, sea area projects, coastline protection, etc., can solve the problems of being bombed and collapsed, tens of meters or even hundreds of meters high, pouring out instantly, loss and other problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017]First of all, apart from a certain safe distance upstream of the dam of the hydropower station, and taking into account factors such as the width, depth, topography and geological conditions of the water surface of the reservoir, another segmented fixed hole leakage gate can be dismantled and automatically alarmed. Backup dam for the gate. Then, according to the width across the water surface and the effective length of each baffle plate with holes to expose steel bars, the number of segments when crossing the water surface is determined, and the number of cement piers at the supporting points is determined at the same time. The construction method of cement piers is basically the same as that of bridge piers. The height of each concrete pier depends on the depth of the water where it is located. The width of the steps of the cement pier is determined by the thickness of the baffle with holes and exposed steel bars; its height can be installed with 1-3 pieces of exposed ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com