Resource obligating method, processing method for charging failure and tactics decision point
A technology for resource reservation and policy decision-making, which is applied in network traffic/resource management, metering/billing/billing devices, connection management, etc., and can solve problems such as insufficient customization, resource provisioning services, and insufficient user account balance. To achieve the effect of comprehensive basis and improve the success rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] Embodiment 1, a method for resource reservation, as shown in the flowchart in FIG. 2 , includes:
[0055] Step a1, the network element receives the service request of the user, and requests the resource reservation policy from the policy decision point;
[0056] Step a2, the policy decision point formulates a resource reservation policy according to the account data of the user;
[0057] Please refer to FIG. 3 together. In this embodiment, the policy decision point formulates a resource reservation policy process according to the user's account data as follows:
[0058] Step b1, the policy decision point interacts with the billing system to obtain the account data of the user;
[0059] The user's account data may include: account balance and / or gifted resources and / or credit limit.
[0060] Step b2, the policy decision point searches for a quality of service parameter (QoS) corresponding to the account data of the user;
[0061] It can be understood that the policy d...
Embodiment 2
[0078] Embodiment 2, a method for resource reservation, the flow chart of which is shown in FIG. 4 , includes:
[0079] Step c1 to step c4 are the same as step a1 to step a4 in the first embodiment, and will not be repeated here.
[0080] Step c5, the network element sends an online charging request requesting to provide services to the user to the charging system;
[0081] In this embodiment, the online charging request is sent through a CCR message.
[0082] Step c6, the billing system charges the user's account, and returns the service quota to the network element.
[0083] In this embodiment, the process of the billing system charging the user's account includes: approval control, reservation control and other processes. The specific billing process can be implemented in an existing conventional manner, which does not constitute a limits.
[0084] Step c7, the network element provides services to the user according to the service quota.
[0085] On the basis of the fir...
Embodiment 3
[0086] Embodiment 3, a method for resource reservation, the flowchart of which is shown in FIG. 5 , including:
[0087] Step d1 to step d7 are the same as step c1 to step c7 in the second embodiment, and will not be repeated here.
[0088] Step d8: During the process of the network element providing services for the user, if the billing system judges that the amount of change in the user account data reaches a preset threshold, the billing system sends the updated account data to the policy decision point ;
[0089] Step d9, the policy decision point re-establishes the resource reservation policy according to the updated account data;
[0090] For the process of re-establishing the resource reservation decision, refer to step a2 in Embodiment 1.
[0091] Referring to Table 1, if the current account balance of the user is 3 yuan, QoS2 needs to be used for resource reservation.
[0092] Step d10, returning the reformulated resource reservation policy to the network element; ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com