Side-discharging construction method for subway station shared underground wall
A technology for subway stations and lateral unloading, applied in excavation, artificial islands, water conservancy projects, etc., to achieve the effects of controlling deformation, speeding up construction time, and reducing exposure time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0009] Further illustrate the present invention below in conjunction with accompanying drawing.
[0010] As shown in Figure 1, the construction method for lateral unloading of the shared underground wall of the subway station of the present invention comprises the following steps:
[0011] (1) Soil reinforcement: in the foundation pit of the new underground structure, soil reinforcement is carried out near the outside of the underground wall of the subway station to strengthen the stability of the station enclosure system; the soil reinforcement adopts mixing piles or high-pressure rotary grouting piles, and the The form of soil reinforcement is reinforced by strips or skirts.
[0012] (2) Upside-down method construction: The upside-down method shall be adopted for the newly-built structure on the outside of the common underground wall. During the construction of the reverse method, the earthwork on the roof of the new underground structure is first excavated, the support is ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com