Construction method of inverse force wall and inverse force dado
A construction method and technology of reaction force pedestal, which are applied in the preparation of test samples, the testing of machine/structural components, material inspection products, etc., can solve the problems of loading hole displacement, welding fixing error, affecting accuracy, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] Such as figure 2 As shown in Fig. 1, the main construction process of the reaction pedestal of the present invention is as follows: formwork installation and positioning and line drawing - using a special loading hole positioning mold to install positioning cakes on the formwork - installing loading holes and positioning Upper end surface - fix the loading hole and install the steel bar binding - pour concrete - remove the formwork. The specific instructions are as follows:
[0042] 1. Template installation, positioning and drawing lines (as shown in Figure 3):
[0043] Install the fixed template 3, and utilize the support system (not shown) to support the template 3; then control the surface flatness of the template 3, and the flatness of the template 3 directly determines the flatness of the lower surface of the counter force pedestal 2 , which is also the premise to ensure the flatness of the upper surface of the counter force pedestal 2; then draw vertical and hor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com