Monorail and two-direction urban subway and scheduling process thereof
A scheduling method and monorail technology, applied in monorail systems, railway vehicles, railway car body parts, etc., can solve the problems of large occupation space and high construction cost, and achieve the effect of small occupation space and low construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0020] The dispatching method of the urban subway in specific embodiment one includes the steps:
[0021] At time 1, as shown in Figure 2a, the right-driving train 4 and the left-driving train 5 meet at the platform. There can be cars waiting at each platform, or there can be cars waiting at one or more platforms;
[0022] At time two, as shown in Figure 2b, the right-driving train 4 leaves the platform, and the left-driving train 5 waits at the platform;
[0023] At time three, as shown in Figure 2c, the right-driving train 4 arrives at the platform, and the left-driving train 5 meets at the platform;
[0024] At time four, as shown in Fig. 2d, the train 5 traveling on the left leaves the platform, and the train 4 traveling on the right is waiting at the platform.
[0025] The above is a scheduling cycle. When the left-hand train 5 arrives at the platform, it returns to time one and starts the next cycle. Repeatedly, the trains in the two directions are alternately operated.
[0...
specific Embodiment 2
[0027] The scheduling method of the urban subway in the second embodiment includes the following steps:
[0028] At time one, as shown in Figure 3a, the right-driving train 4 and the left-driving train 5 meet at the platform, and there are one or more platforms between the two adjacent platforms. There is no train, that is, the empty platform ;
[0029] At time two, as shown in Figure 3b, the right-driving train 4 and the left-driving train 5 exit the platform at the same time;
[0030] At time three, as shown in Fig. 3c, both the right-driving train 4 and the left-driving train 5 arrive at the next platform, meet at the platform, and wait at the platform.
[0031] The above is a scheduling cycle. When the waiting time ends, it returns to time one and starts the next cycle. Repeatedly, the trains in two directions are operated.
[0032] During operation, when a train is detected on any section of the monorail running track, all the trains waiting on the platform can be stopped, un...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com