A biofilm system and urban sewage technology, applied in the field of urban sewage treatment, can solve the problems of complex operation technology, non-recovery of nitrogen and phosphorus, low nitrogen and phosphorus removal rate, etc., to achieve the effect of enhancing biodegradation and reducing treatment costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0015] Specific implementation mode one: combine figure 1 To illustrate, the Spirogyra-biofilm system of this embodiment removes and recycles the method for nitrogen and phosphorus in urban sewage according to the following steps: the pretreated urban sewage flows through the Spirogyra-biofilm system, and the Spirogyra-biological The hydraulic retention time in the membrane system is 2 to 7 days, that is, the process of removing and recovering nitrogen and phosphorus in urban sewage is completed; Spirogyra-biofilm system consists of oxidation pond 5 and cultivation pond 1, and oxidation pond 5 is arranged Spirogyra 2 and biofilm 4 are arranged, and Spirogyra 2 and biofilm 4 adopt the "upper-down" combination method. Spirogyra 2 is arranged on the water surface of oxidation pond 5, and the bottom of Spirogyra 2 is supported and fixed by plastic grid 3. The biofilm 4 is vertically arranged under the grid 3, the water flow mode of the oxidation pond 5 is bottom-in and top-out, an...
specific Embodiment approach 2
[0016] Specific embodiment two: the difference between this embodiment and specific embodiment one is: Spirogyra-biofilm system is made up of oxidation pond and cultivation pond, is arranged in oxidation pond and is arranged with biofilm, arranges and cultivates Spirogyra in the cultivation pond, Spirogyra in the oxidation pond is replaced every 5 to 10 days. Other steps and parameters are the same as in the second embodiment.
specific Embodiment approach 3
[0017] Embodiment 3: This embodiment differs from Embodiment 1 or Embodiment 2 in that: the hydraulic retention time in the oxidation pond is 2 to 7 days. Other steps and parameters are the same as those in Embodiment 1 or Embodiment 2.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com