Construction method of concrete used for reinforcing underwater pier
A technology of bridge pier reinforcement and construction method, which is applied to bridge reinforcement, bridges, bridge parts, etc., can solve the problems of inability to use concrete for underwater bridge pier reinforcement, and cannot be implemented, and achieves strong continuous operation, less auxiliary equipment, and occupation. Small construction area
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0041]The construction method of the concrete for underwater bridge pier reinforcement of the present invention is the same as that of Embodiment 1 except that all the underwater bridge pier reinforcements are poured in one time with the underwater non-segregated concrete 5 .
Embodiment 3
[0043] The construction method of concrete for underwater pier reinforcement of the present invention is the same as that of embodiment 1, except that all underwater pier reinforcements are poured in 5 minutes of underwater non-segregated concrete.
Embodiment 4
[0045] The construction method of the concrete for underwater pier reinforcement of the present invention is the same as that of embodiment 1 except that all the underwater non-segregated concrete for underwater pier reinforcement is poured in seven times in 5 minutes.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com