Building process for ship central control room
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- GUANGZHOU SHIPYARD INTERNATIONAL LTD
- Publication Date
- 2014-08-13
Smart Images
Figure 1
Abstract
Description
technical field
[0001] The invention relates to shipbuilding technology, in particular to a modular construction process of a ship centralized control room. Background technique
[0002] The central control room is an independent cabin with the largest electrical workload in the ship engine room construction area, involving many types of work, many procedures, many cross operations, the most cumbersome and complicated process, and the longest construction period; important influence. Usually, the outfitting work of the central control room is carried out after the structure of the central control room is formed on the ship. Due to many unfavorable factors such as the long complete work cycle and the influence of cross-operation, the construction work time in the dock (sway) Long, affecting the cycle of the entire ship occupying the dock (sway), delaying the progress of shipbuilding, and restricting the shipbuilding capacity of the shipyard.
[0003] If the centralized cont...