Road side slope ecological restoration meshed backflow water-holding and water-saving method and application thereof
A technology for ecological restoration and slope, applied in the fields of application, botanical equipment and methods, excavation, etc., can solve the problems of wasting water resources, consuming maintenance labor, etc., and achieve the effect of promoting the overall level, obvious water saving effect, and promoting improvement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Embodiment 1: A kind of road slope ecological restoration gridding backflow water conservation and water saving method, it comprises the following steps:
[0026] (1) Trench digging: according to the scale and gradient of the side slope 1, several backflow ditches 2 are dug horizontally on the side slope, and several water diversion ditches 3 are dug vertically. The depth h1 of the backflow ditch 2 is 30cm, and the width l1 is 25cm The depth h2 of the water diversion ditch 3 is 15cm, and the width l2 is 15cm; the backflow ditch 2 and the water diversion ditch 3 are in a criss-cross state; the slope return ditch distance L1 is 2m, and the water diversion distance L2 is 5m.
[0027] (2) Landfill: Fill the mixed matrix 4 composed of high humus materials such as clay soil and polymer water-retaining and water-absorbing agent in the return ditch and the water diversion ditch, and then add planting soil.
[0028] (3) Plant grass-shrub vegetation on the planting soil.
[0029...
Embodiment 2
[0036] Embodiment 2: A kind of road slope ecological restoration gridding backflow water conservation and water saving method, it comprises the following steps:
[0037] (1) Trench digging: According to the scale and slope of the slope 1, several return ditches 2 are dug horizontally and several water diversion ditches 3 are dug vertically on the slope. The depth h1 of the return ditches 2 is 36cm, and the width l1 is 30cm The depth h2 of the water diversion ditch 3 is 20cm, and the width l2 is 20cm; the backflow ditch 2 and the water diversion ditch 3 are in a criss-cross state; the slope return ditch distance L1 is 3m, and the water diversion distance L2 is 5m.
[0038] (2) Landfill: Fill the mixed matrix 4 composed of high humus materials such as clay soil and polymer water-retaining and water-absorbing agent in the return ditch and the water diversion ditch, and then add planting soil.
[0039] (3) Plant grass-shrub vegetation on the planting soil.
[0040] The components...
Embodiment 3
[0047] Embodiment 3: A kind of road slope ecological restoration gridding method for water conservation and water conservation, which comprises the following steps:
[0048] (1) Trench digging: According to the scale and slope of the slope 1, several return ditches 2 are dug horizontally on the side slope, and several diversion ditches 3 are dug vertically. The depth h1 of the return ditches 2 is 42cm, and the width l1 is 30cm The depth h2 of the water diversion ditch 3 is 25cm, and the width l2 is 25cm; the backflow ditch 2 and the water diversion ditch 3 are in a criss-cross state; the slope return ditch distance L1 is 4m, and the water diversion distance L2 is 6m.
[0049] (2) Landfill: Fill the mixed matrix 4 composed of high humus materials such as clay soil and polymer water-retaining and water-absorbing agent in the return ditch and the water diversion ditch, and then add planting soil.
[0050] (3) Plant grass-shrub vegetation on the planting soil.
[0051] The compon...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com