Combined regenerative energy power supply device
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] In this embodiment, the wind power is sufficient, the wind turbine operates normally, and its output power is greater than the demanded power of the load, the wind power generation unit supplies power to the regional user loads of the regional architecture system, and the photovoltaic power generation unit is in the power generation or outage state. In this state, due to the instability, discontinuity, and uncontrollability of wind power generation, the large-capacity energy storage elements and wind power generation units in the regional structure of this device supply power to regional user loads at the same time, and the commutation at the end of the large-capacity energy storage elements The inverter works in the state of inverter, and is adjusted by the coordination control unit, so that the power supplied to the regional user load is in a constant voltage 220v alternating current state.
[0028] In this state, the external large power grid system does not supply po...
Embodiment 2
[0031] In the regional framework of this embodiment, the wind power is insufficient to meet the load requirements. In this case, the output power of the photovoltaic power generation unit is monitored. If the power supplied by the photovoltaic power generation unit is greater than the power demanded by the load, the large-capacity energy storage system and photovoltaic power generation The system supplies power to the load at the same time. The converter at the end of the large-capacity energy storage element works in the inverter state, and after adjustment by a coordination control unit, the power supplied to the regional user load is in a constant voltage 220v AC state.
[0032] In this state, the external large power grid system does not supply power to this area structure, the large-capacity energy storage components are running in the discharge state, the photovoltaic power generation unit is in the power generation state, the wind turbine is out of operation, and is disco...
Embodiment 3
[0035] In the regional framework of this embodiment, the power supplied by photovoltaic power generation and wind power generation cannot meet the demand of regional user loads. In this state, the external large power grid system should supply power to this regional structure to meet the load demand of its regional users. At this time, the large-capacity energy storage element operates in a charging state, and is powered by an external power grid. The wind power generation unit and the photovoltaic power generation unit are in a shutdown state, and are disconnected by the wind power generation switching control unit and the photovoltaic power supply switching control unit. The power grid works in the traditional operating state, and supplies power to regional user loads and large-capacity energy storage components at the same time, and the converter works in the rectifier state.
[0036] The operating status of the large-capacity energy storage element, the voltage and curren...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com