34 results about "Power pool" patented technology

Power pooling is used to balance electrical load over a larger network (electrical grid) than a single utility. It is a mechanism for interchange of power between two and more utilities which provide or generate electricity For exchange of power between two utilities there is an interchange agreement which is signed by them, but signing up an interchange agreement between each pair of utilities within a system can be a difficult task where several large utilities are interconnected. Thus, it is more advantageous to form a power pool with a single agreement that all join. That agreement provides established terms and conditions for pool members and is generally more complex than a bilateral agreement.

Power pool-based dual-layer bus direct microgrid and control method therefor

The invention relates to a direct current microgrid, specifically relates to a power pool-based dual-layer bus direct microgrid and a control method therefor, and solves the problems of high energy conversion loss and low system operating efficiency of the existing single-bus direct current microgrid, and high probability of power interference and poor system operating economy of the existing dual-bus direct current microgrid. The power pool-based dual-layer bus direct microgrid comprises an energy storage voltage regulation system, a direct current sub grid I and a direct current sub grid II, wherein the energy storage voltage regulation system comprises a power pool, a lithium battery pack, a DC/DC converter I, a DC/DC converter II and a DC/DC converter III; the power pool comprises a supercapacitor and a middle bus in parallel; the direct current sub grid I comprises a photovoltaic power generation unit I, a direct current load I and a direct current bus I; the direct current sub grid II comprises a photovoltaic power generation unit II, a direct current load II and a direct current bus II; and the direct current sub grid I and the direct current sub grid II have different voltage levels. The power pool-based dual-layer bus direct microgrid is applicable to a variety of fields.
Owner:TAIYUAN UNIV OF TECH

Reliability design method for large electric network safety steady cooperativeness defensive system

A reliability design approach of the power pool safe stable coordination defense system includes a control framework with the site population and function division, wherein the control framework includes a dispatching center station, a control main station, a control sub-station and a control execution station, the control sub-station and the control execution station realize the regional control; and the control main station take charge of the coordination of each regional control; the dispatching center station take charge of the computation of the online control strategy and the online coordination control between the main control stations. The invention effectively solves the reliability problems of the coordination defense system caused by the device, the communication and the software and the like; the online control framework of 'site population and function division' avoids the paralysis of the whole system caused by the local device and the communication failure, advances the whole reliability of the coordination defense system; the computing device and the control device adopt the redundant configuration, which enhances the local reliability of the system; the coordination control system adopts the online and the off-line operation mode switching mechanism, which advances the operation reliability of the system.
Owner:NARI TECH CO LTD +1

Solving method of takeoff performance of ground effect vehicle

The invention discloses a solving method of the takeoff performance of a ground effect vehicle. The takeoff performance comprises takeoff water-leaving speed, water-leaving time and water skiing distance. The method comprises the steps of carefully analyzing a relationship between hydrodynamic resistance/thrust/ angle of trimming in full-aircraft powered pool model test data and speed, a relationship between the hydrodynamic resistance/thrust/ angle of trimming and the center of gravity, and the relationship between the hydrodynamic resistance/thrust/ angle of trimming and weight; finding feature points; carrying put segmentation fitting on the hydrodynamic resistance, the thrust and the angle of trimming to obtain the relational expressions of the hydrodynamic resistance, the thrust and the angle of trimming; obtaining the relational expression of the hydrodynamic resistance and the speed by combining with a CFD (Computational Fluid Dynamics) computation result or a wind tunnel test result; and quickly and effectively calculating the takeoff performance of the ground effect vehicle in different states according to an equation of motion of the ground effect vehicle. The invention provides a computation method suitable for the takeoff performance of the ground effect vehicle and provides a good condition for the total performance computation of the ground effect vehicle.
Owner:CHINA ACAD OF AEROSPACE AERODYNAMICS

Combined regenerative energy power supply device

The invention provides a combined regenerative energy power supply device which comprises a wind power generation unit, a photovoltaic power generation unit, a high-capacity energy storage element and a coordination control unit, wherein the high-capacity energy storage element is used for storing electric energy; the coordination control unit is used for enabling the wind power generation unit or the photovoltaic power generation unit to charge the high-capacity energy storage element when the electric quantity produced by the wind power generation unit and the photovoltaic power generation unit is higher than the demand of users in a region, and supplying power to an outside power pool system under the condition that the electric energy is surplus after the charging of the high-capacity energy storage element is finished; and the coordination control unit is also used for cutting off the wind power generation unit and the photovoltaic power generation unit and enabling the outside power pool system to charge the high-capacity energy storage element and supply power to loads of the users in the region when the electric quantity produced by the wind power generation unit and the photovoltaic power generation unit is lower than the demand of the users in the region. According to the invention, line loss and construction investment caused by remote locations of power generation places and long distances from loads can be effectively reduced.
Owner:POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD

Closed-loop self-adaption emergency control method for large electric network 'centralized coordination, layered control'

InactiveCN100576681CRealize closed-loop adaptive emergency controlSolving Transient Stability ProblemsData processing applicationsComputer controlPrimary stationClosed loop
A closed loop self-adapting emergency control method of power pool' centralized harmonization and hierarchy control' is disclosed, which adopts the quadrilayer structure of a dispatching center station, a control main station, a control sub-station and a control execution station from top to bottom, including the following control steps: 1. safely and stably controlling the system uploading operation data to the dispatching center station; 2. controlling the decision-making computation by the dispatching center station to obtain the online strategy table; 3. sending down the online strategy to the control main station by the dispatching center station and furthermore sending down to the related control sub-station by the control main station; 4.judging the failure and the overload according to the related failure and the overloading criterion by the control sub-station and the execution station; 5. transmitting the failure information to the upper control station layer by layer by the control sub-station and the execution station; 6. performing the failure combination match by the control main station; 7. sending the cutting machine and the cutting load command tot he corresponding control sub-station by the control main station; 8. reprocessing and transmitting to the execution station by the control sub-station; 9. cutting machine and cutting load exit by the execution station.
Owner:JIANGSU ELECTRIC POWER CO

Charging topology network and direct current contactor control system and method in charging system

The invention belongs to the technical field of power electronics, and discloses a charging topology network and a direct current contactor control system and method in a charging system. The charging topology network comprises a plurality of groups of power modules, a plurality of groups of direct current contactors and a plurality of groups of terminals. The plurality of groups of direct current contactors comprise a plurality of groups of first direct current contactors, a plurality of groups of second direct current contactors and a plurality of groups of main direct current contactors; the plurality of groups of power modules are composed of at least two groups of power modules; each group of power modules is connected with at least one group of first direct current contactors, and the multiple groups of first direct current contactors are connected in series to form an annular structure; each group of power modules is connected with a corresponding terminal through a group of main direct current contactors; and each group of power modules is electrically connected with the direct current contactors connected with any one group of non-adjacent power modules on the annular structure through one group of second direct current contactors. According to the invention, different contactors are attracted to form different channels which are connected with different power modules to form a power pool of the terminal, so that the purpose of power switching is achieved.
Owner:绿能慧充数字技术有限公司

A double-layer bus DC microgrid based on power pool and its control method

The invention relates to a direct current microgrid, specifically relates to a power pool-based dual-layer bus direct microgrid and a control method therefor, and solves the problems of high energy conversion loss and low system operating efficiency of the existing single-bus direct current microgrid, and high probability of power interference and poor system operating economy of the existing dual-bus direct current microgrid. The power pool-based dual-layer bus direct microgrid comprises an energy storage voltage regulation system, a direct current sub grid I and a direct current sub grid II, wherein the energy storage voltage regulation system comprises a power pool, a lithium battery pack, a DC / DC converter I, a DC / DC converter II and a DC / DC converter III; the power pool comprises a supercapacitor and a middle bus in parallel; the direct current sub grid I comprises a photovoltaic power generation unit I, a direct current load I and a direct current bus I; the direct current sub grid II comprises a photovoltaic power generation unit II, a direct current load II and a direct current bus II; and the direct current sub grid I and the direct current sub grid II have different voltage levels. The power pool-based dual-layer bus direct microgrid is applicable to a variety of fields.
Owner:TAIYUAN UNIV OF TECH

Optimizing downlink communications between a base station and a remote terminal by power sharing

A method of optimizing downlink for communications between a base station and mobile stations in a wireless communication system involves acquiring user identifiers and geometry values for mobile stations that are associated with registered users of the system, associating modulation control scheme (MCS) power values with respective users in response to respective geometry values, initializing a power pool, identifying users that have an MCS power value greater than a reference MCS power value as high power users and calculating a power difference for each of the high power users. The power difference is a difference between the geometry value associated with each of the high power users and a reference geometry value associated with the reference MCS power value respectively. The power differences associated with respective high power users are accumulated in the power pool, by summing the power differences. Users that have an MCS power value below the reference MCS power value are identified as low power users and increased geometry values are associated with at least some of the low power users while the power pool is reduced by corresponding amounts until the power pool is depleted. New MCSs are then determined for at least some of the low power users based on the increased geometry values and control information is transmitted to the low power users using modulation and control schemes identified by the corresponding new MCSs at power levels associated with the new MCSs.
Owner:APPLE INC

Combined regenerative energy power supply device

The invention provides a combined regenerative energy power supply device which comprises a wind power generation unit, a photovoltaic power generation unit, a high-capacity energy storage element and a coordination control unit, wherein the high-capacity energy storage element is used for storing electric energy; the coordination control unit is used for enabling the wind power generation unit or the photovoltaic power generation unit to charge the high-capacity energy storage element when the electric quantity produced by the wind power generation unit and the photovoltaic power generation unit is higher than the demand of users in a region, and supplying power to an outside power pool system under the condition that the electric energy is surplus after the charging of the high-capacity energy storage element is finished; and the coordination control unit is also used for cutting off the wind power generation unit and the photovoltaic power generation unit and enabling the outside power pool system to charge the high-capacity energy storage element and supply power to loads of the users in the region when the electric quantity produced by the wind power generation unit and the photovoltaic power generation unit is lower than the demand of the users in the region. According to the invention, line loss and construction investment caused by remote locations of power generation places and long distances from loads can be effectively reduced.
Owner:POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD

Method for automatically recognizing power pool multi-area dynamic operation method

InactiveCN100576683CDynamic online identificationAccurate online identificationData processing applicationsEmergency protective circuit arrangementsRelationship - FatherSoftware design
The invention discloses an automatic recognizing method for the multi-region dynamic running mode of a large power network. The method comprises the following steps: the state variables of active components contained in a node can be fast and reliably transmitted to a father node A in a regional power network by dint of optical fiber communication and successor nodes B1, B2, ellipsis, Bm in the regional power network; the running mode Gamma of the current system is obtain by carrying out online uniform discrimination according to a state recognition function Gamma which is equal to f (Beta0, Beta1, Beta2, ellipsis, Betam) after the father node A is combined with the state variables of the active components thereof. The method completely avoids the previous improper method which only can automatically recognize the running mode of certain specific power network, and can online-recognize the runner mode parameters of the current large power network dynamically and precisely; the recognition time of the method is short, and the recognition can be automatically finished within a few milliseconds; when the structure of the power network changes, the software of the node in the power network is not required to be redesigned, thereby the method greatly saves the labor resources, the material resources and the financial resources, and improves the automation degree and the efficiency; besides, the reliability is also improved.
Owner:JIANGSU ELECTRIC POWER CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products