Environment protection explosion squeezing silting embanking method
An environmentally friendly technology for blasting and silting, which is applied in the field of blasting and silting and embankment. It can solve the problems of strong vibration caused by the amount of charge, difficult policy processing, and prolonged construction period. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Embodiment one: a kind of environment-friendly blasting method for squeezing silt and embankment, comprising the following steps:
[0027] ① First, determine the height of embankment throwing and filling according to the geological exploration report, geotechnical calculation principle and embankment design height, then calculate the width of embankment throwing and filling according to the height of embankment filling and the designed section of embankment, and then according to the actual geological conditions of the project, According to the construction status and repeated throwing and filling conditions on the slope, determine the length of throwing and filling footage;
[0028] ② First, deal with the underwater soft foundation empirical formula q′ according to the explosion method L =q 0 L H h mw and Calculate the amount of charge per unit length of explosive filling at the dike head, where q′ L Indicates the amount of wire cloth, the unit is Kg / m; q 0 Indi...
Embodiment 2
[0038] Embodiment two: an environment-friendly blasting method for squeezing silt and embankment, comprising the following steps:
[0039] ① First, determine the height of embankment throwing and filling according to the geological exploration report, geotechnical calculation principle and embankment design height, then calculate the width of embankment throwing and filling according to the height of embankment filling and the designed section of embankment, and then according to the actual geological conditions of the project, According to the construction status and repeated throwing and filling conditions on the slope, determine the length of throwing and filling footage;
[0040] ② First, deal with the underwater soft foundation empirical formula q′ according to the explosion method L =q 0 L H h mw and Calculate the amount of charge per unit length of explosive filling at the dike head, where q′ L Indicates the amount of wire cloth, the unit is Kg / m; q 0 Indicates the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com