Power distribution scheduling aid decision making method based on multiple dimensions

An auxiliary decision-making, multi-dimensional technology, applied in the field of power distribution network, can solve problems such as reducing power supply reliability, power grid stability impact, and non-guaranteed power tasks.

Active Publication Date: 2013-11-13
STATE GRID CORP OF CHINA +1
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In fact, in the distribution network load reversal and accident handling (i.e., load transfer), it is often necessary to consider whether there is a power guarantee task, operational complexity (the number of operating switches is the least), the number of dual power supply users, and whether it

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power distribution scheduling aid decision making method based on multiple dimensions
  • Power distribution scheduling aid decision making method based on multiple dimensions
  • Power distribution scheduling aid decision making method based on multiple dimensions

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0037] A multi-dimensional auxiliary decision-making method for power distribution dispatching is based on figure 1 Realized on the system shown, the system includes energy management system (EMS), distribution network management system (DMS) (including distribution network graphic management, geographic information system and load transfer calculation, etc.) and multiple power distribution dispatching auxiliary decision-making system terminal. The energy management system (EMS), distribution network management system (DMS) and multiple distribution dispatching auxiliary decision-making system terminals are connected together through the dispatching communication network. Among them, the energy management system (EMS) is used as the source of real-time data of the system to collect and process real-time data of the distribution network; the distribution netw...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a power distribution scheduling aid decision making method based on multiple dimensions. The method is characterized by including the following steps that 1 terminals of an energy management system, a power distribution network management system and a power distribution scheduling aid decision making system are connected through a scheduling communication network; 2 the energy management system acquires the current power distribution network operation state and real-time line data information; 3 the power distribution network management system adopts a self-adaptation immune algorithm to process the power distribution network operation state and the line data and builds a transfer load mathematical model for a power distribution network and for transfer load calculation; 4 a radar map with five dimensions is generated on the terminal of the power distribution scheduling aid decision making system to provide an aid decision making basis for a scheduling worker. The method is reasonable in design, adopts the core algorithm of the power distribution network transfer load, achieves real-time online management of the power distribution network, effectively solves the problem that the existing switching operation relies on the experience of the scheduling worker, is low in efficiency and the like, improves power grid stability and reliability and reduces power failure time for users.

Description

technical field [0001] The invention belongs to the technical field of power distribution networks, in particular to a multi-dimensional auxiliary decision-making method for power distribution dispatching. Background technique [0002] In recent years, with the continuous development of power grid construction, the structure of power grids at all levels has been significantly strengthened. However, the urban distribution network is still relatively weak compared with the main network in terms of grid structure and management level. At present, the central urban areas of the distribution network are mostly cables, and the network structure adopts a ring network structure, while the suburban areas with more loads are mostly overhead lines, and the network structure has radial, single-connection or multi-connection methods. [0003] At present, dispatching manages the distribution network mainly through the management of drawings and materials. The dispatcher modifies the draw...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q50/06
CPCY04S10/54Y04S10/50
Inventor 仝新宇王永杰陈向东李昕杜彬李晓永任桂田刘楠朱晓亮杨乔川
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products